Similar Projects
Northeast Georgia Medical Center South Hall Campus Renovation
Renovation, Infrastructure
Conception
$10,000,000 CJ est. value
Braselton, GA 30517

New Cut Road Mixed-Use Development
New Construction, Infrastructure - 104,500 SF
Conception
$60,000,000 CJ est. value
Braselton, GA 30517

Braselton Village
New Construction, Infrastructure
Design
$75,000,000 CJ est. value
Hoschton, GA 30548

VDC Senior Independent Living Phase I
New Construction, Infrastructure - 95,869 SF
Design
$12,000,000 CJ est. value
Braselton, GA 30517

Phase 2 Renovations and Additions to the Animal Shelter - Re-Bid
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,250,000 CJ est. value
Jefferson, GA 30549

Elevated Water Storage Tank
Infrastructure
Bidding
$3,300,000 CJ est. value
Hoschton, GA 30548

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Parking Lot Sealing and Restriping
Infrastructure
Results
Athens, Jefferson, Talmo, GA 30607

Lawrenceville Street Waterline Replacement
Infrastructure
Results
$375,000 est. value
Jefferson, GA 30549

Northeast Georgia Health System
New Construction, Infrastructure
Construction
$6,500,000 CJ est. value
Jefferson, GA 30549

Heritage Guard Storage Buildings
New Construction, Infrastructure - 16,703 SF
Construction
$1,800,000 CJ est. value
Hoschton, GA 30548

Del Webb at Chateau Elan Phase IV
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Braselton, GA 30517

Del Webb at Chateau Elan Phase IV
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Braselton, GA 30517

New Waste Water Treatment Facility (WWTF) - City of Commerce
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Commerce, GA 30529

Last Updated 01/05/2024 04:22 PM
Project Title

CS 751/CR 1317/Davis St @ 1 LOC & CS 753/Pinecrest Ln @ 1 LOC Project

Physical Address View project details and contacts
City, State (County) Braselton, GA 30517   (Jackson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Braselton Sidewalk Improvement Project consists of the shoulder improvements to construct a 5- foot sidewalk along Davis Street and Pinecrest Lane including storm drain improvements and lighting. The last date an addendum will be issued will be by January 8th, 2024. The amount of liquidated damages will be determined by GDOT Section 108.08. All proposals shall be accompanied by a Bid Bond in favor of the Town of Braselton, in the amount of five percent (5%) of the total bid for the complete work; such Bid Bond representing that the Bidder, if awarded a contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the attorney for the Town. The Performance and Payment bond shall meet the requirements in GDOT section 103.05. The Bid Bond shall be forfeited to the Town of Braselton as liquidated damages if the Bidder fails to execute the Contract and Performance and Payment Bonds within ten (10) days after being notified that he has been awarded the Contract. The Town of Braselton reserves the right to reject any and all bids. The Contract will be awarded, if at all, within one hundred twenty (120) calendar days after opening of the proposal. Contractor is advised that Federal Funds are being utilized for construction of this project. The Disadvantaged Business Enterprise (DBE) goal for project is 11%. All subcontractors including DBE firms are to be GDOT registered subcontractors or prequalified contractors. Bidders will be required to complete Federal Aid Certification of Compliance. Sub-contracts by the prime should also include these provisions. The completed DBE Goals Form, Federal Aid Certification, and Georgia Security and Immigration Compliance Act Affidavit shall be submitted with the bid. The work shall be completed within 365 calendar days from the date of the official Notice to Proceed. Questions regarding Bidding documents, Drawings and Specifications should be directed to BM&K Construction & Engineering (Attention: John Jenkins, P.E.) at telephone (706) 824-0514 or jjenkins@bmandkinc.com no later than Friday January 4th, 2024.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents