Similar Projects
Football Stadium Parking Expansion
Infrastructure
Conception
$4,700,000 est. value
Paradise, CA 95969

San Pedro Waterfront - Berths 74-83 Promenade Phase II - Port of Los Angeles - Construction Division
Alteration
Conception
$16,500,000 est. value
Los Angeles, CA

Laguna Creek and Whitehouse Creek Multi-Functional Corridor Project - WDR018 - City of Elk Grove
Infrastructure
Design
$3,164,000 est. value
Elk Grove, CA

Construct Two Auxiliary Lanes and Upgrade Four Ramp Metering Systems
Infrastructure, Alteration
Design
$17,583,000 est. value
Elk Grove, CA 95758

1 Parrot Street Rehabilitation
Infrastructure
Bidding
$83,419 est. value
Vallejo, CA 94590

Cold Plane and Place HMA, Replace Guardrail and Curb Ramps
Infrastructure
Bidding
$11,400,000 est. value
Belmont, CA 94002

Street Resurfacing On Federal-Aid Streets Fy2020-21
Alteration
Post-Bid
$2,618,546 est. value
Stockton, CA 95206

Pavement Striping, Markings and Markers
Infrastructure
Post-Bid
Cathedral City, CA 92234

2021 Redwood Highway Frontage Road Pavement Repair Phase 1
Infrastructure
Results
$350,000 est. value
Mill Valley, CA 94941

Richmond Residential Streets Pavement Renovation and Sewer Replacement
Infrastructure
Results
$7,300,000 est. value
San Francisco, CA

Cameron Park Drive Widening - Palmer Drive to Sudbury - 72143 - El Dorado County
Alteration
Conception
$6,047,000 est. value
Cameron Park, CA 95682

Pavement Repair (Capm)
Alteration
Design
$7,350,000 est. value
Lee Vining, CA 93541

SR99 at Standiford Avenue and SR99 at Briggsmore Avenue Interchanges Projects
Infrastructure
Bidding
$12,940,000 est. value
Modesto, CA

Place HMA (Type A) Overlay
Infrastructure
Post-Bid
$1,400,000 est. value
CA

Bald Hills Road Resurfacing Project
Infrastructure
Results
Hoopa, CA 95546

Reported 06/29/2022 10:58 AM
Project Title

Potato Cut Project - Shasta County

Physical Address View project details and contacts
City, State (County) Montgomery Creek, CA 96065   (Shasta County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Montgomery Creek, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. $700 million for new infrastructure construction. Approved projects include: The Potato Cut project in Shasta County near Montgomery Creek from just west of Woodhill Drive to 1 mile west of Big Bend Road. This project includes roadway curve improvement, widens shoulders, corrects a cross slope and installs guardrail. As of June 28, 2022, funding is to be received for this project. Amount of funding has not been disclosed. Information regarding a design team or a general contractor is not available. A timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents