Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
ID

Constructing Alternating Passing Lanes with Signing on US-26, MP 360.3 to MP 363.0
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
ID

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Reconstructing Railroad Avenue
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
ID

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Pavement Rehabilitation With Cement Treated Base
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
ID

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Bidding
ID

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

Adding a Southbound Passing Lane and Replacing the Rock Creek Culverts With a Three-Sided Box Culvert On Us-95, Mp 283.83 To Mp 286.13
Infrastructure
Bidding

Widening SH-3 and conducting levee repair between MP 91.86 and MP 89.26
Infrastructure
Results
ID

Culdesac Canyon Passing Lane, PH 3
Infrastructure
Bidding
$10,000,000 to $15,000,000 est. value

Last Updated 11/15/2021 01:33 AM
Project Title

Thorn Creek Road to Moscow PH 1

Physical Address View project details and contacts
City, State (County) ID   (Latah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing approximately 5.8 miles of new 4 lane divided highway on US-95 between Thorn Creek Road and Moscow in Latah County. Two 318 foot bridge structures (North Bound and South Bound) will be constructed over Eid road

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents