Similar Projects
Chase Tank - City of Corona
Infrastructure
Conception
$6,000,000 CJ est. value
Corona, CA 92879

Main Library Remodel - 16-08 - City of Palm Springs
Demolition, Build-out, Infrastructure
Conception
$9,738,000 CJ est. value
Palm Springs, CA 92262

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Dave's Hot Chicken / Cathedral City
Demolition, New Construction, Infrastructure - 2,675 SF
Design
$800,000 CJ est. value
Cathedral City, CA 92234

Washington Street at Avenue 50 and Calle Tampico Sidewalk and Ada Improvements
Infrastructure
Bidding
$120,000 CJ est. value
La Quinta, CA 92253

Washington Street at Avenue 50 and Calle Tampico Sidewalk and Ada Improvements
Infrastructure
Bidding
$120,000 CJ est. value
La Quinta, CA 92253

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Riverside Facility Asphalt Overlay Project
Infrastructure
Post-Bid
Riverside, CA 59968

2021 Citywide Slurry Seal Project
Infrastructure
Results
$3,200,000 est. value
Murrieta, CA 92562

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Hillcrest HS Portables
New Construction, Infrastructure
Construction
$587,000 CJ est. value
Riverside, CA 92503

Amanda Ave and Winchester Road Mixed-Use
New Construction, Infrastructure - 7,550 SF
Pending Verification
$3,300,000 CJ est. value
Riverside, CA 92522

Amanda Ave and Winchester Road Mixed-Use
New Construction, Infrastructure - 7,550 SF
Pending Verification
$3,300,000 CJ est. value
Riverside, CA 92522

Virada - Future Phases
New Construction, Infrastructure
Design
$326,000,000 CJ est. value
Indio, CA 92201

Pavement Striping, Markings and Markers
Infrastructure
Post-Bid
Cathedral City, CA 92234

Last Updated 10/12/2022 05:33 PM
Project Title

Pavement Rehabilitation For Various Local Streets

Physical Address View project details and contacts
City, State (County) Moreno Valley, CA 92557   (Riverside County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,169,800 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 23, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The project consists furnishing all labor, materials, necessary tools and machinery, supervision and coordination, traffic control, and all utility and transportation services required for the construction and reconstruction of street improvements that include pavement resurfacing, slurry seal, striping and signing, and other related improvements on the streets as included in the Plans and listed in the Bid Schedule. The bidder is solely responsible for on time submission of their electronic bid. The City will only consider bids that have been transmitted successfully and have been issued an ebid confirmation number with a time stamp from the Bid Management System indicating that the bid was submitted successfully. Transmission of bids by any other means will not be accepted. Bidder shall be solely responsible for informing itself with respect to the proper utilization of the bid management system, for ensuring the capability of their computer system to upload the required documents, and for the stability of their internet service. Failure of the bidder to successfully submit an electronic bid shall be at the bidder's sole risk and no relief will be given for late and/or improperly submitted bids. Online Q&A Yes Q&A Deadline 08/26/2022 2:00 PM (PDT) Pre-Bid Meeting No Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Bid Valid Sixty (60) Days Liquidated Damages $500 Per Calendar Day Estimated Bid Value Start/Delivery Date TBD Project Duration Eighty (80) Working Days

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents