Similar Projects
Chair City Church Parking Expansion
Conception
Gardner, MA 01440

Crack Sealing at Various Locations
Infrastructure
Bidding
$1,044,875 est. value

Crack Sealing at Various Locations
Infrastructure
Bidding
$1,044,875 est. value

Resurfacing of Various Streets & Appurtenant Work
Infrastructure
Sub-Bidding
$550,000 est. value
Marlborough, MA

Furnish Bituminous Concrete Driveway Mix
Post-Bid
Acton, MA

Miscellaneous Bituminous Type I Repairs - Handwork
Post-Bid
$9,500 est. value
Shrewsbury, MA

Roadway Reconstruction and Related Work (Including Signals) Along A Section of Hartford Avenue North, High and Main (Route 140) Streets (Phase 2)
Results
Less than $3,422,718 est. value
Upton, MA 01568

Roadway Reconstruction and Related Work (including Signals) along Sections of Ridge Street and Johnson Road (Safe Routes to School - Vinson-Owen Elementary School)
Results
Less than $1,584,458 est. value
Winchester, MA 01890

Resurfacing and Related Work on A Section of Route 122A (Main Street)
Infrastructure
Bidding
$2,261,924 est. value
Holden, MA

Town Center Improvements Project
Post-Bid
$900,000 est. value
West Brookfield, MA

Scheduled and Emergency HMA Pavement and Paved Waterway Repairs at Various Locations
Results
Less than $180,000 est. value

Paving Of Town Roads
Infrastructure
Bidding
Rutland, MA

Mill and Fill Road Repairs
Post-Bid
$48,320 est. value
Tewksbury, MA

Random Crack Sealing
Results
Less than $88,000 est. value
Woburn, MA

Polymer and Crumb Rubber Modified Asphalt Compound Crack Sealing
Infrastructure
Bidding
$100,000 est. value
Sterling, MA

Last Updated 04/11/2022 11:09 AM
Project Title

Road Paving and Treatment 2022 Through 2024

Physical Address View project details and contacts
City, State (County) Ayer, Devens, Harvard, Shirley, MA (Middlesex, Worcester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves the road pavement work to be funded under the MassDOT Chapter 90 program. The work will be contracted and executed separately in Ayer, Devens, Harvard and Shirley. Work will include Asphalt Cold Planing, Bituminous Concrete Paving, Pavement Reclaiming and Grading, Reinforced Crack Sealing, Treated Stone Seal, Rubberized Chip Seal, Line Painting, Curbing, Sidewalks and other pavement related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents