Similar Projects
Nature Center Restroom and St. Andrews Low Pressure Sewer Improvements
Infrastructure
Bidding
$470,000 est. value
New Richmond, WI

Road Work Bid
Infrastructure
Post-Bid
Forest, WI

Various Construction Season Materials/Services
Infrastructure
Post-Bid
Baldwin, WI

Star Prairie - Osceola, Scl to Cth Y
Results
Osceola, Star Prairie, WI

Glenwood City - Colfax, STH 128 to STH 79, Glenwood City - Colfax, STH 25 to CTH D, Glenwood City - Colfax, STH 79 to STH 25
Results
Colfax, Glenwood City, WI 54013

Twin Valley Road Improvements
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Street Maintenance Project
Infrastructure
Post-Bid
Hudson, WI 54016

Perch Lake Road Improvements
Results
Hudson, WI 54016

250th Street Reconstruction
New Construction
Results
Glenwood City, Hudson, WI 54013

City of Hudson, Second Street, Front Street to Vine Street
Results
Hudson, North Hudson, WI 54016

Hudson - Baldwin, CTH U to West Jct. STH 65; Hudson - Baldwin, CTH U to West Jct. STH 65
Results
Baldwin, Hudson, WI

2021 Road Rehabilitation
Results
Hudson, WI

Woodville Best Road Improvements
Results
Woodville, WI 54028

Rose Lane/70th Avenue WisDOT TRIP-D Street Improvements
Results
Baldwin, WI

Reported 04/13/2022 12:00 AM
Project Title

2022 Road Maintenance

Physical Address View project details and contacts
City, State (County) Boardman, WI 54016   (Saint Croix County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of crack sealing and seal coat on Rolling Hills Trail, Old E East, 61st St, 122nd Ave. Alternates include 80th St crack sealing, patching and seal coating, as well as AMZ spray patching on Valley View Trail and Scott Road. The project consists of the following items and approximate quantities: Base Bid 9,440 LB Crack Route and Seal or Overband 15,700 LB Transverse Crack Repair 375 TN Seal Coat Aggregate 11,070 GAL Bituminous Material for Seal Coat (CRS-2P) 28,500 LF Pavement Markings 150 SY Full Depth HMA Patching Alternates 3,400 LB Crack Route and Seal or Overband 1,900 LB Transverse Crack Repair 40 TN Seal Coat Aggregate 1,200 GAL Bituminous Material for Seal Coat (CRS-2P) 370 SY Full Depth HMA Patching AMZ Spray Patching

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents