Similar Projects
Improve Curve Widen Shoulder
Infrastructure
Design
$7,620,000 CJ est. value
Lucerne, CA 95458

Improve Curve Widen Shoulder
Infrastructure
Design
$7,620,000 CJ est. value
Lucerne, CA 95458

On-Call Engineering Services For Pavement Rehabilitation
Infrastructure
Bidding
$7,472,000 CJ est. value
Lucerne, CA 95458

On-Call Engineering Services For Pavement Rehabilitation
Infrastructure
Bidding
$7,472,000 CJ est. value
Lucerne, CA 95458

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Maha Guenoc Valley
New Construction, Infrastructure
Pending Verification
$798,000,000 CJ est. value
Middletown, CA 95461

Maha Guenoc Valley
New Construction, Infrastructure
Pending Verification
$798,000,000 CJ est. value
Middletown, CA 95461

Lake County Park Improvements - Lake County
Renovation, Infrastructure
Design
Clearlake Oaks, CA 95423

Upper Tank Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Kelseyville, CA 95451

Kelseyville High School Gymnasium Site Work Project
Infrastructure
Results
$2,000,000 est. value
Kelseyville, CA 95451

Clear Lake Rehabilitation - Lake County
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Lakeport, CA 95453

Smith Street Affordable Housing Community
New Construction, Infrastructure - 2,469 SF
Design
$15,000,000 CJ est. value
Lakeport, CA 95453

Last Updated 05/09/2023 05:15 PM
Project Title

2022 Double Chip Seal Project

Physical Address View project details and contacts
City, State (County) Clearlake, CA 95422   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $912,945 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 14, 2022, the project has been awarded. A timeline for construction has not been confirmed. 2022 Double Chip Seal Project In accordance with California Public Contract Code Section 3400, bidders may propose equals of products listed in the technical specifications or project plans by manufacturer name, brand or model number, unless the City has made findings as specified herein. Complete information for products proposed as equals must be submitted to California Engineering Company for review at least ten (10) working days before the time specified for bid opening in accordance with the bidders instructions contained in the bid package. In accordance with California Public Contract Code Section 20170, all bids must be presented under sealed cover and include one of the following forms of bidder's security: cash, cashier's check made payable to the City, certified check made payable to the City, or a bidder's bond. The amount of bidder's security provided must equal at least ten (10) percent of the total of the bid price for the base bid and the additive or deductive items listed in this notice. The successful bidder must submit to the City complete, executed copies of all required documents within ten (10) working days of receiving written notice of award of the project. Bidder's security of any successful bidder that fails to do so will be forfeited to the City. Such required documents include, but are not limited to, a payment or labor and materials bond in an amount of at least 100 percent of the amount payable by the terms of the project contract and that satisfies the requirements of California Civil Code Section 9554, and a performance bond in an amount of at least 100 percent of the amount payable by the terms of the contract. All project bonds must be executed by an admitted surety insurer in accordance with applicable law and acceptable to the City. The City of Clearlake reserves the right to postpone the date and time for the opening of proposals at any time prior to the date and time announced in the advertisement in accordance with applicable law. The City of Clearlake reserves the right to reject any and all bids or to waive any defects or irregularity in bidding in accordance with applicable law. In accordance with California Public Contract Code Section 20103.8, if the City elects to award a contract for performance of the project, the contract will be awarded in accordance with California Public Contract Code Section 20162 and other applicable law to the responsible bidder submitting a responsive bid with the lowest total bid price for the base bid without consideration of the bid price for any additive or deductive items. All bids will remain valid for 90 days after the bid opening. Except as permitted by law and subject to all applicable remedies, including forfeiture of bidder's security, bidders may not withdraw their bid during the 90 day period after the bid opening *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents