Similar Projects
Chick-Fil-A
New Construction - 4,400 SF
Conception
Annandale, VA 22003

Fairfax Peak Indoor Ski Resort
New Construction - 500,000 SF
Conception
$10,000,000 CJ est. value
Lorton, VA

Strangeways Brewing Taproom / Williamsburg
Renovation - 4,000 SF
Design
$620,000 est. value
Williamsburg, VA 23185

Sycamore Plaza
New Construction, Build-Out - 31,800 SF
Design
Norfolk, VA 23523

Mudhouse Coffee
Renovation - 1,663 SF
Post-Bid
Richmond, VA 23220

Dunkin' Donuts/Baskin Robbins #362724
New Construction - 2,400 SF
Post-Bid
Aldie, VA 24522

Renovation of Chick-Fil-A at Christopher Newport University
Renovation - 409 SF
Results
Newport News, VA 23606

The Mather
New Construction - 686,435 SF
Construction
$500,000,000 est. value
McLean, VA 22102

Chick-Fil-A Drive #01689
Renovation, Addition - 5,054 SF
Construction
Manassas, VA 23960

Liberty Market Mixed-Use / Lorton
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Lorton, VA 22079

Hard Rock Hotel and Casino Bristol
New Construction, Renovation - 30,000 SF
Pending Verification
$300,000,000 est. value
Bristol, VA 24201

Starbucks - Tenant Improvement
Build-Out - 1,223 SF
Conception
Gloucester Point, Hayes, VA 23072

Raising Cane's / Manassas
Demolition, Infrastructure, Build-out - 2,899 SF
Design
$1,500,000 CJ est. value
Manassas, VA 20110

IAD Capital One Lounge
Build-Out - 8,500 SF
Post-Bid
Dulles, VA

Gilbert Street Mixed-Use Development
New Construction, Demolition - 180,000 SF
Construction
$56,000,000 est. value
Blacksburg, VA

Last Updated 03/15/2023 07:08 PM
Project Title

Starbucks #49087 / Norfolk

Physical Address View project details and contacts
City, State (County) Norfolk, VA 23505   (Norfolk City County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

This is a 1913 sq ft renovation of the Starbucks at this location. Scopes of work include but are not limited to interior demolition, site concrete, casework install, storefront glass at walk up window, drywall, ceramic tile install, eco grip install, painting, plumbing, HVAC, electric. Other scopes may be needed that are not listed here. Review the plans for the full scope of work. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

1 Story Above Grade, 1,913 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents