Similar Projects
Road Construction
Infrastructure
Bidding
Ferguson, MO

Heman Park Service Road Improvements
Infrastructure
Bidding
University City, MO

Repave Streetscape at Justice Center
Post-Bid
Ballwin, MO 63011

Improving Mueller Road
Infrastructure
Post-Bid
Green Park, MO 63123

FY22-FY26 On-Call Paving
Term Contract
Results
Olivette, MO

Holloway Road Improvements
Results
Ballwin, MO 63011

Intersection Improvements at North Highway 67 and Saint Ferdinand Street
Infrastructure
Bidding
Florissant, MO 63034

2021 Concrete Pavement Replacement
Infrastructure
Post-Bid
Bridgeton, MO 63044

Asphalt Overlay Improvements
Results
University City, MO

Repavement of the Streetscape and Flag Pole Installation at the Justice Center
Infrastructure, Alteration
Bidding
Clayton, MO 63105

2020 CRS Pavement Rehabilitation
Infrastructure
Post-Bid
MO

Asphalt Paving Repair
Results
Saint Louis, MO

Topping Road Improvements Phase I
Infrastructure
Bidding
$1,700,000 est. value
Town and Country, MO

University Drive , Grobman Road and North Campus West Drive Paving
Infrastructure
Post-Bid

Kirkwood School District Paving Maintenance Projects 2021
Term Contract
Results
Kirkwood, Saint Louis, MO 63122

Last Updated 07/31/2021 02:04 AM
Project Title

Old State Route 21 Asphalt Pavement Improvements

Physical Address View project details and contacts
City, State (County) Saint Louis, MO   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes: construction of Type A3 shoulders, 3/8" trap rock with CR2SP oil pavement preservation, rumble strips, striping and traffic control. The roadway shall always have at least one lane open during construction. Pavement repairs at failing concrete joints below asphalt pavement are also included. Failing joints shall be replaced with 10.5" of PCCP under 3.5" of BP-1 asphalt.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents