Similar Projects
Rosedale Center Mixed Use Development
New Construction - 290,000 SF
Conception
$10,000,000 CJ est. value
Roseville, MN 55113

Duluth`s United Health Group Building
Renovation - 170,000 SF
Conception
$16,000,000 est. value
Duluth, MN 55811

Minnesota Health Village
New Construction - 40,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Maple Grove, MN 55369

Mickelson Invesments Building
New Construction - 12,700 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Clearwater, MN

2021 Baggage Claim Ticket Lobby Operational Improvements P2
Renovation, Demolition
Bidding
Saint Paul, MN 55111

Twin Cities Habitat For Humanity
Renovation
Bidding
Cottage Grove, MN

Baxter Retail Shell Building and Jimmy Johns
New Construction, Build-Out
Sub-Bidding
Baxter, MN 56425

Nova Care Outpatient Physical Therapy Clinic
Renovation - 1,970 SF
Post-Bid
Saint Paul, MN 55106

Womens Clinic and Mammography Addition, Y1DA
New Construction, Addition - 14,000 SF
Post-Bid
$10,000,000 est. value
Minneapolis, MN 55417

Remodel Office Spaces Veterans Services Building - General
Renovation
Results
Less than $225,000 est. value
Saint Paul, MN

Rosedale Outparcel South Shell Building Package
New Construction - 4,900 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Roseville, MN 55113

Freeborn-Mower Cooperative Services Headquarters
New Construction - 97,800 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Albert Lea, MN

RiversEdge Mixed Use Development
New Construction - 1,900,000 SF
Pending Verification
$10,000,000 CJ est. value
Saint Paul, MN

4Front Office And Industrial Area Expansion
Addition, Infrastructure - 310,000 SF
Pending Verification
Oakdale, MN

Dickinson Spring Industrial Park Expansion
New Construction
Conception
Buffalo, MN 55313

Last Updated 08/04/2021 11:30 AM
Project Title

Austin Community Action Building

Physical Address View project details and contacts
City, State (County) Austin, MN   (Mower County)
Category(s) Commercial, Medical
Sub-Category(s) Medical Office/Outpatient, Office
Contracting Method
Project Status Design Development, Construction Start Expected October 2021, Construction Completion Expected third quarter 2022
Bids Due View project details and contacts
Estimated Value Greater than $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Office, 12,350 SF Addition, Medical Office/Outpatient, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents