Similar Projects
Take 5 Oil Change
New Construction - 1,432 SF
Conception
Less than $500,000 CJ est. value
Fredericksburg, VA

New Visions Industrial Park
New Construction - 60,000 SF
Conception
Prince George, VA 23875

Loisdale Sheehy Automobile Dealership
New Construction - 37,000 SF
Design
Springfield, VA

Quick Lube Oil Change Facility
New Construction - 1,450 SF
Design
Less than $500,000 CJ est. value
Lynchburg, VA

Volvo Truck-NRV
Renovation, Addition - 6,891 SF
Bidding
$1,500,000 est. value
Dublin, VA 24084

Bayside Ford
New Construction
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
King George, VA 22485

Strickland Brothers Oil Change #553
New Construction - 1,725 SF
Post-Bid
Warrenton, VA 20186

911th Vehicle Maintenance Shop at Fort Belvoir, VA
New Construction - 9,967 SF
Results
$10,000,000 to $25,000,000 est. value
Fort Belvoir, VA

MWEOC B470 Transportation Fy 2021 NSA ARC
New Construction - 7,100 SF
Results
$10,000,000 est. value
Bluemont, VA 20135

Lindsay Chrysler - Manassas
Addition - 22,800 SF
Construction
$4,000,000 est. value
Manassas, VA 20111

Beyer Land Rover/Jaguar Automotive Dealership
New Construction - 50,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Alexandria, VA 22310

Caliber Collision
New Construction, Renovation - 9,200 SF
Pending Verification
Charlottesville, VA 22901

Carmax
New Construction
Pending Verification
Winchester, VA 22638

Strickland Express Oil Change Facility
New Construction
Conception
Chesapeake, VA

Discount Tire
New Construction, Demolition - 7,680 SF
Design
Charlottesville, VA 22901

Reported 07/16/2022 12:00 AM
Project Title

Valvoline

Physical Address View project details and contacts
City, State (County) Haymarket, VA 20169   (Prince William County)
Category(s) Commercial
Sub-Category(s) Vehicle Sales/Service
Contracting Method Bids by Invitation.
Project Status Sub-Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

The following trades will be required to complete this project: Excavation / Earthwork / Site Prep ? Strip and clear site, fill as necessary to meet grades, provide building pad per soils report, include erosion controls, site demo, and site utilities (include all required bedding per details and local authority requirements), include dewatering consisting of (2) 3? pumps that can be hard wired and run 24/7 if necessary, include manholes furnished and installed for building sump pumps and provide an alternate to furnish and install all foundation drain pipe and sump pumps connecting the pipe and making everything operational, you will be digging through weathered rock to get to the basement bottom of footer bid accordingly, provide unit costs for export/haul off of unsuitable soils, import, place and compact engineered fill, place and compact onsite fill and over excavation all per CY; Asphalt Paving and Striping - 1.5? wearing course, 2.5? binder course over 8? of stone, include parking block, handicap sign, stop sign, fire lane signs, one way signs and ALL striping; Landscaping and Irrigation - include an alternate to furnish topsoil for landscape areas per plan depths, include an alternate for sleeves, include all plantings; Hollow Core Precast Concrete Plank Floor - figure in layout openings per the structural floor plan per S-3.1; Concrete - Include a break out cost for waterproofing, Foundation Wall and Footings, Lower Floor Slab and Concrete Topping, Site / Parking Pavements, Building Sidewalk, Curb, Dumpster Pad, Install Bollards and (4) Light Pole Bases; Masonry - INCLUDE FLASHING, dumpster enclosure is block and brick/stone veneer wainscot with a precast top per sheet A-10, Brick for building exterior over wood framing to be Belden - Modular Hamilton Blend A; Structural Steel - Dumpster Gates with posts and mounting hardware, bollards, lintels, stairs, handrails and railings, 10 ga. platform to pour concrete over; Rough Carpentry - Wood Framing and Sheathing, include trusses, alternate price for insulation and another alternate price for drywall, include all draft stopping; Finish Carpentry - Install of doors, frames, hardware, restroom accessories, furnish and install FRP, counters, shelving, install interior signage and items listed as vendor furnished GC installed on A-1 Fixtures and Equipment Schedule, furnish and install corner guards; Waterproofing, Damp Proofing, Weather Barriers, Flashing, Caulking and Masonry Water Repellents; Batt Insulation; Roofing - Shingles, Aluminum Soffit/Fascia, Gutter and Downspouts; EIFS ? Dryvit system; Doors, Frames and Hardware; Glass and Glazing; Overhead Doors - National Account by Overhead Door Company; Flooring - Seamless Resinous Quartz (by Silikal, Dur-A-Flex or Res-Tek), VCT (include waxing); Painting - include the concrete floor sealer finish F-3, include floor striping, include painting all exposed steel Valvoline Red, include painting underside and frames of awnings; Awnings - Standing Seam 1.5" Tube Steel Frame painted by others, include snow guards; Restroom Accessories - Refer to Fixture & Equipment Schedule on A-1 for specs; Countertops, Shelving, Bench, Cabinets, Windowsills - details spread out through many of the architectural plans; Plumbing - Include vent piping for owner equipment as necessary, provide an alternate to furnish and install all foundation drain piping and 2 sump pumps, include gas line, read general and coded notes on PP-4 Process Piping Plan to review responsibility and price accordingly; HVAC - Split system, Exhaust Fans, Transfer Fan, Radiant Heaters, Duct Heater, Ductwork and Air Distribution Devices; Electrical - Include Secondary Conduit and Conductors from Transformer, Include Conduit Only for Phone Service consisting of (2) 2? Conduits, Furnish and Install Lighting, Panels, Excavation and Backfill for Service work and Site Lights, Supply Power to Sump Pumps

Details

Vehicle Sales/Service, 2 Stories Above Grade, 3,776 SF Renovation.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents