Similar Projects
RFI 20-082 MM Automated Traffic Management System (ATMS)
Post-Bid

Wrong Way Driving Traffic Control Enhancement Phase 1 Consisting of Signing, Signal Headupgrades and Pavement Markings
Post-Bid
$1,000,000 to $5,000,000 est. value

Replacement of Traffic Signal Cabinets, Traffic Signal Controllers, and Installation of Advanced Detection at Various Locations in Region 1
Results
$1,000,000 to $5,000,000 est. value

Existing Traffic Signals with New Mast Arm Signals, ADA Compliance Curb Ramps, and Portions of New Sidewalk
Results
$5,000,000 to $20,000,000 est. value

On-Call Work Zone Traffic Control Devices & Services
Post-Bid
Arvada, CO

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

Traffic Signal Improvements on Union Boulevard at Florida Avenue and at Sere Lane
Post-Bid
Lakewood, CO

Wrong Way Driving Traffic Enhancements
Results
$1,000,000 to $5,000,000 est. value

Work Zone Traffic Control Device Rental and Service
Post-Bid
Arvada, CO

Rebuilding the Signals in Three Different Locations
Results
$1,000,000 to $5,000,000 est. value

Traffic Signal Maintenance
Term Contract
Results
Golden, CO 80419

Traffic Signal Replacement
Results
Less than $1,000,000 est. value
CO

Arvada Traffic Signal Interconnect
Results
$300,000 to $320,000 est. value
Arvada, CO

Upgrade Existing Traffic Signals and Curb Ramps at Seven Intersections
Results
$1,000,000 to $5,000,000 est. value
CO

Traffic Signal Replacement
Results
$1,000,000 to $5,000,000 est. value

Last Updated 11/20/2020 09:29 AM
Project Title

Signal Replacement and Intersection Improvements Project at SH 121

Physical Address View project details and contacts
City, State (County) CO   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Region 1 Signal Replacement and intersection improvements project at SH 121 (Wadsworth Blvd) and 1st Avenue. 203-01597 Potholing 60.000 HOUR 503-00036 Drilled Shaft (36 Inch) 38.000 LF 503-00054 Drilled Shaft (54 Inch) 42.000 LF 614-70336 Traffic Signal Face (12-12-12) 18.000 EACH 614-70448 Traffic Signal Face (12-12-12-12) 4.000 EACH 614-72855 Traffic Signal Controller Cabinet 1.000 EACH 614-81145 Traffic Signal-Light Pole Steel (1-45 Foot Mast Arm) 1.000 EACH 614-81155 Traffic Signal-Light Pole Steel (1-55 Foot Mast Arm) 1.000 EACH 614-81170 Traffic Signal-Light Pole Steel (1-70 Foot Mast Arm) 2.000 EACH 626-00000 Mobilization 1.000 L S 630-00000 Flagging 30.000 HOUR 630-00003 Uniformed Traffic Control 25.000 HOUR 630-00012 Traffic Control Management 28.000 DAY 630-80355 Portable Message Sign Panel 4.000 EACH

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents