Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

SH078 - Grade, Draining, Bridge and Surface
Infrastructure, Renovation
Design
$8,548,355 CJ est. value
Calera, OK 74730

Durant Multi Sports Complex Parking Lot Resealing
Infrastructure
Bidding
$500,000 CJ est. value
Durant, OK 74701

Durant Multi Sports Complex Parking Lot Resealing
Infrastructure
Bidding
$500,000 CJ est. value
Durant, OK 74701

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Slabjacking and Subsealing Services
Infrastructure
Results

Resurface (Asphalt) US-69
Infrastructure
Results
OK

Bridge and Approaches - SH 78
Infrastructure
Design
$2,997,300 CJ est. value
Calera, OK 74730

Resurface (Asphalt) SH-78: From Main Street, Extend North in Durant
Infrastructure
Bidding
$1,306,779 CJ est. value
Durant, OK 74701

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Resurface (Asphalt) US-70
Infrastructure
Results
OK

Widen, Resurface and Bridge - SH 48
Infrastructure
Design
$19,620,000 CJ est. value
Durant, OK 74701

2 Road Projects
Infrastructure
Post-Bid
$123,000 est. value
Durant, OK

Resurface (Asphalt) US-70
Infrastructure
Results

Last Updated 01/27/2023 02:32 AM
Project Title

Grade, Drain and Surface - US 70

Physical Address View project details and contacts
City, State (County) Bokchito, OK 74726   (Bryan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected April 2026
Bids Due View project details and contacts
Estimated Value $2,724,999 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-70: Ramps at Hillcrest Drive in Durant, Approx 3.0 Mi East of Sh-78. As of January 27, 2023, the project is in Design status. Anticipated letting month/year is August, 2025. Length : 0.500 Mi. OKDOT - Grade, Drain and Surface - US 70 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents