Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

HVAC Services
Term Contract
Results
Salem, VA

Clearbrook Elementary Rooftop HVAC Unit Replacement
Term Contract
Results
Roanoke, VA 24014

Armstrong SF665DW Heater Replacement Parts
Post-Bid

Installation of Bathroom Fans for Villages at Lincoln
Results
Roanoke, VA 24012

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replacement of Heating and Domestic Hot Water Systems for Lansdowne Park, AMP 201, Phase 1
Results
Roanoke, VA 24017

Metro Hanger HVAC
Alteration
Post-Bid
Henrico, VA 23250

Replacement of Heat Pumps for 18 Scattered Sites, AMP 215
Results
Roanoke, VA

Chiller(s) 1 and 2 Maintenance and Inspection Services
Term Contract, Alteration
Results
Roanoke, VA

VWCC Replace Chiller Thomas Center
Renovation, Alteration - 945 SF
Results
Roanoke, VA 24015

Division 6 Chiller Replacement
Alteration
Results
Salem, VA 24153

Northside High School Makeup Air Unit Addition
Alteration
Results
Roanoke, VA 24019

Brambleton Recreation Center Boiler Replacement
Alteration
Results
Roanoke, VA 24015

Reported 06/17/2022 10:18 AM
Project Title

Green Ridge Dehumidification - Roanoke County

Physical Address View project details and contacts
City, State (County) Hollins, VA 24019   (Roanoke County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Fitness Center, HVAC
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value $740,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Green Ridge Dehumidification Units Replacement project will replace two dehumidification units that are reaching the end of their useful life.Replacement is planned for Fiscal Years 2025 through 2027 with $740,000 in funding. The project is included in the Roanoke County's FY 2023-2032 Capital Improvement Program (CIP). As of June 16, 2022, further details regarding design and construction have not been identified.

Details

Fitness Center, Renovation.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment, Humidity Control Equipment, Mechanical Dehumidification Units.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents