Similar Projects
HVAC Preventative Maintenance Services, NWS Romeoville, IL
Post-Bid
Romeoville, IL 60446

N041--25 Ton Chiller Replacement
Post-Bid
North Chicago, IL

HVAC Equipment Replacement
Results
Evanston, IL 60201

Niles West Domestic Water Heater Replacement
Renovation
Results
Skokie, IL 60077

Connect B1 W Penthouse to Central Chiller Plant
Post-Bid
Marion, IL 62959

Water Meter Transmission Unit Replacement
Results
Streamwood, IL 60107

J041--Marion VA Medical Center Annual York Chiller Inspection and Preventive Maintenance
Post-Bid
Marion, IL

Boiler Replacement at Indian Trail JHS
Renovation
Results
Addison, IL 60101

Purchase and Delivery of LED Luminaires
Post-Bid
Carol Stream, IL 60188

Oswego Pump Station Electrical Upgrades
Renovation
Results
Oswego, IL 60543

Generator
Post-Bid
Fairview Heights, IL 62208

IVCC Building G AHU Replacement
Results
Oglesby, IL 61348

2020 Lighting Maintenance
Term Contract
Post-Bid
Algonquin, IL

DOC-Sheridan-Outdoor Chiller for C3
Results
Sheridan, IL 60551

HVAC Inspection, Analysis & Preventative Maintenance
Term Contract
Post-Bid
Rockford, IL 61104

Last Updated 10/15/2020 05:49 PM
Project Title

Chiller Replacement - Mechanical, Electrical And Ventilation

Physical Address View project details and contacts
City, State (County) Macomb, IL 61455   (McDonough County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, tools, and equipment necessary to remove the existing items as indicated in the Thompson Hall Dining Mechanical Room and Residence Hall Mechanical/Electrical Room in Western Illinois University's Thompson Hall, Macomb, IL. Install two (2) new chillers (Owner-furnished), pumps, electrical gear including electrical substation (Owner-furnished), and associated piping, conduits, controls, supports, and auxiliary equipment, including upgrade existing cooling tower and construction of new electrical room.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Examination and Preparation, Field Engineering, Construction Layout.
Division 02 - Existing Conditions, Demolition, Selective Site Demolition.
Division 08 - Openings, Louvers, Fixed Louvers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Common Work Results for Electrical, Medium-Voltage Cables, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Surface raceways for Electrical Systems, Identification for Electrical Systems, Substations, Secondary Unit Substations, Low-Voltage Circuit Protective Devices, Enclosed Switches and Circuit Breakers.
Division 31 - Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Erosion and Sedimentation Controls, Stabilization Measures for Erosion and Sedimentation Control, Hydraulically-Applied Erosion Control, Soil Treatment, Termite Control, Soil Stabilization, Geosynthetic Soil Stabilization and Layer Separation, Geotextile Soil Stabilization, Geotextile Layer Separation, Excavation Support and Protection.
Division 32 - Exterior Improvements, Base Courses, Aggregate Base Courses, Cement-Treated Base Courses, Portland Cement-Stabilized Base Courses, Flexible Paving, Asphalt Paving, Asphalt Paving Joint Sealants.
Division 33 - Utilities, Subdrainage, Storm Drainage Structures.
Division 40 - Process Integration, Primary Control Devices, Variable Frequency Drives.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents