Similar Projects
Indefinite Delivery Indefinite Quantity Architectural-Engineering Contracts
Design

AE Indefinite Quantity Contract (IQC)
Bidding
$1,000 to $5,000,000 est. value
Maricopa, Tucson, AZ - Riverside, CA

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Bidding
Less than $45,000,000 est. value
Washington, DC

C--A-E IDIQ for Facilities Maintenance and Sustainment Support and Engineering work predominantly in the NAVFAC AOR Worldwide
Post-Bid
Less than $90,000,000 est. value

Design, Engineering, Construction, and Technical Services for installation/relocation of Radiation Portal Monitors
Post-Bid

Hydrographic IDIQ
Results
Less than $40,000,000 est. value

C--IDIQ Contract for A/E Work for Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and Other DOD Installations, and Federal Agencies
Results

On-Call Consultant Pre-Qualified List for Transportation/Traffic Engineering and Related Services
Bidding
Chandler, AZ

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Issue 30-Day Solicitation Notice for SF 330's
Results

Professional Services for Archaeological Clearance-La Plaza and Las Acequias
Bidding
Tempe, AZ

On-Call Materials Testing and Related Services
Post-Bid
Tempe, AZ 85280

Light Rail Safety and Security Oversight
Results

National Region AE IDIQ
Bidding
$20,000,000 est. value

Consultant for Warehouse Operations Modernization
Post-Bid
Tempe, AZ 85281

Reported 09/25/2020 12:00 AM
Project Title

Professional Services for Alley Rehabilitation PM10 Dust Emissions

Physical Address View project details and contacts
City, State (County) Chandler, AZ 85225   (Maricopa County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project mitigates dust emissions by replacing the top 4” to 6” of dirt and gravel and older aggregate base course with crushed asphalt milling materials. The asphalt millings are from milled roadway surface that will normally be discarded as waste. This project will recycle the asphalt millings into the alleyways to create a more dust free driving surface 15.3 miles of alleys. The alleys are used by homeowners, utility companies, and garbage trucks to access backyards, utility boxes, and garbage cans on a daily basis. This project will improve the alleyway surface, improve the air quality and recycle material that would have been discarded from other street resurfacing projects. The project delivery method for the construction work is lowest responsible bidder. The project is located in four neighborhoods within the City of Chandler limits: 1. Segment 1 includes approximately 5.2 miles of unpaved alleys located within the Woodglen neighborhood Northeast corner of Dobson Road and West Elliot Road. 2. Segment 2 includes approximately 6.4 miles of unpaved alleys located within the Sunridge/Mission Valley / New Horizons / Espanada neighborhood Northeast of Alma School Rd and W. Elliot Road. 3. Segment 3 includes approximately 2.8 miles of unpaved alleys located within Suggs Corona Village neighborhood NE of Rural Road and Ray Road. 4. Segment 4 includes approximately 0.90 miles of unpaved alleys located within the Pepperwood neighborhood N ortheast of McClintock Road and West Chandler Boulevard.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents