Similar Projects
Reported | 07/24/2020 12:00 AM |
Project Title | 126th Construction Projects (Scott AFB, IL) |
Physical Address | View project details and contacts |
City, State (County) | Belleville, IL 62225 (Saint Clair County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | Less than $250,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The 126th ARW currently has projected funding to cover many, if not all, of the following requirements: 1. Repair Hangar Fire suppression, B5024 The work specified by this section consists of furnishing all labor, equipment, tools, appliances, transportation, materials, and quality control reports required to perform modifications to Hangar Fire Suppression Systems. The work consists of three main items and multiple secondary items. The main items include reprogramming/reconfiguring the foam releasing panel, replacing the manual foam releasing stations and conduits, and installing Surge Protection Devices (SPD) (also referred to as TVSS). The secondary items include providing de-humidifiers in the foam rooms and providing required signage. 2. Repair Electrical and Parking Lot Lights, B5008 Contractor shall ensure that the electrical components, breakers and receptacles are configured in a way that no more than four (4) workstations in Bldg 5008 are on the same breaker to meet code and 126th requirements. Contractor shall replace the existing exterior lighting with LED fixtures and/or bulbs to increase energy efficiency. Any photovoltaic cells that are needed to be replaced or added shall be done so at this point so all exterior lighting turn on when exterior lighting decreases. This should include. Contractor shall complete the work originally completed by the recently completed electrical contract to have the arm gate at rear vehicle entrance to Bldg 5008 to ensure that the arm gate is fully functioning as intended during the original design. 3. Construct CF Tower base bldg 5010 The work consists of furnishing all labor, materials and equipment necessary to complete a concrete communication tower foundation capable of supporting the TX-455 Self-Supporting Triangular Crank-Up Tower per the following manufacturing guidelines (see Tower Model TX-455 c rev1 Plans, dated 12 December 2009 for details). Work also includes to install the tower onto the foundation, this will be a separate line item during the bidding process. 4. Repair Lights, B5004/B5046 The purpose of this project is to replace the warehouse lighting in Buildings 5004 and 5046. The existing High Intensity Discharge (HID) lighting shall be replaced with high efficiency Light Emitting Diode (LED) lighting and upgraded controls as specified herein. In addition, the office lighting of the front area of Bldg 5004 will also be replaced with LED lighting. 5. Repair Boilers, B5000 The 126th Air Refueling wing has existing boilers that were installed over 20 years ago in Bldg 5000 and require constant repair and maintenance. This project entails providing all necessary material, labor and equipment to completely replace all boilers, components and controls systems associated with the existing boilers. The system should be a complete and functioning system tested and ready for operation when work is completed. The equipment shall be installed in accordance with all approved building, plumbing, electrical and health codes and function as specified. 6. Repair CO Detectors, B5006 The 126th Air Refueling wing has existing Carbon Monoxide (CO) detectors that were installed over 20 years ago in Bldg 5006 and are no longer functioning properly. The system is an analog type system and is in need of a refurbishment to a digital system to meet current Air Force requirements. This project entails providing all necessary material, labor and equipment to completely replace all CO detectors in Bldg 5006. The system should be a complete and functioning system tested and ready for operation when work is completed. The equipment shall be installed in accordance with all approved building, plumbing, electrical and health codes and function as specified. 7. Repair/Replace Wet Dust Collector System, B5022 Contractor shall remove the existing wet dust collector system and all associated components and dispose of properly off base. The new system shall be installed in accordance with Air National Guard Design Policy per Engineering Technical Letter ANG ETL 15-01 and UFC3-410-06 (Industrial Ventilation), Federal and State Electrical Codes, and industry standards. 8. Repair Fire Suppression System & Add Heat, B5004 TBD |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |