Similar Projects
Mitchell Dailey Drive Lift Station
Results
$1,284,738 est. value
Mitchell, SD 57301

West Lift Station
New Construction
Results
$330,000 est. value
Elkton, SD

Lift Station and Forcemain Installation
New Construction, Infrastructure
Post-Bid
$515,000 est. value
Hudson, SD

Lake Norden Main Lift Station Improvements
Results
$575,000 to $600,000 est. value
Lake Norden, SD 57248

Sturgis I-90 Crossing and Booster Station
New Construction
Results
$2,162,126 to $2,883,016 est. value
Sturgis, SD

Wastewater System Improvements
Results
Delmont, SD

Pump Station 240 Capacity Improvements
Post-Bid
Less than $5,687,511 est. value
Sioux Falls, SD 57110

East Farmer Avenue Lift Station Replacement
New Construction
Post-Bid
$300,000 est. value
Howard, SD 57349

Creek Lift Station and Force Main
New Construction
Results
SD

Pump Station 218 Improvements - Tuthill
Results
$1,850,000 est. value
Sioux Falls, SD 57105

Harrisburg Pooling Point
New Construction - 80 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Worthing, SD

Pump Station 203 Improvements
Post-Bid
$2,150,000 est. value
Sioux Falls, SD

Meter Buildings
Renovation
Results
$1,800,000 to $2,250,000 est. value
Hull, Sioux Center, IA - Beresford, SD

Last Updated 07/07/2021 03:10 PM
Project Title

MCWC EROS Control Valve Station

Physical Address View project details and contacts
City, State (County) Dell Rapids, SD   (Minnehaha County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

One (1) above-ground pump station; The pump station will include all pumps, piping, fittings, flow meters, transmitters, gauges, combination air valves, pressure relief valves, check valves, and telemetry & control system to provide a complete and functioning pump station; The pump station shall include all electrical and mechanical systems; PVC piping connections on inlet and outlet sides of the pump station including approximately 250 feet of 12-inch watermain, 180 feet of 8-inch watermain, tracer wire, fittings, valves, joint restraints, and concrete thrust blocking; Site work including, but not limited to, excavation, fill, grading, access road construction, chain link fence construction, erosion control, and site top-soiling, seeding and restoration

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents