Similar Projects
Michigan Math and Science Academy
Renovation - 59,680 SF
Bidding
Warren, MI 48092

Heritage and Messmore Renovations
Renovation
Post-Bid
Sterling Heights, MI 48312

Middle School Renovatiions
Renovation
Post-Bid
Richmond, MI 48062

Disaster Recovery Services
Results

Roseville high school - Welding Classroom Improvements Project
Results
Roseville, MI 48066

Academy of Warren Professional Construction Manager
New Construction, Renovation
Construction
$6,500,000 est. value
Warren, MI 48089

Richmond Community Schools High School Auxiliary Gym Addition and Renovations
Renovation, Addition
Post-Bid
Richmond, MI 48062

2018 Bond Program-Bid Package 20-1(A-D)
Results
Warren, MI

Eisenhower Mechanical and Kitchen Upgrades
Renovation
Post-Bid
Sterling Heights, MI

2021 District Projects (Many Trades)
Results
Clinton Township, MI

Print Shop Renovation
Renovation
Post-Bid
Warren, MI

Center Line High School Renovation BP21-2
Renovation
Results
Center Line, MI 48015

BP 5 - Jefferson Middle School Kitchen and Classroom Additions
Addition
Post-Bid
Saint Clair Shores, MI 48081

Mount Clemens High School Elevator Renovation
Renovation
Results
Mount Clemens, MI 48043

Jeannette Building Renovations
Renovation
Post-Bid
Sterling Heights, MI 48310

Last Updated 01/20/2022 10:28 AM
Project Title

Warren Woods Middle School Serving Line Renovations

Physical Address View project details and contacts
City, State (County) Warren, MI 48088   (Macomb County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of, but is not limited to: Renovation of the existing Kitchen Serving Line including reconfiguration of the serving line with selective demo, new flooring, wall and ceiling finishes, reconfigured storage room, relocation of existing food service equipment with installation of new for the new serving line, new wood doors and HM frames, new horizontal folding sliding grille, with new lighting, plumbing and HVAC work associated with the renovation.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents