Similar Projects
Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,114,000 CJ est. value
Harrold, SD 57536

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,114,000 CJ est. value
Harrold, SD 57536

Install Cured in Place Pipe Lining in Condenser Water Piping
Term Contract
Design
Pierre, SD 57501

Modify Intersection, PCC Surfacing
Infrastructure
Design
$3,600,000 CJ est. value
Harrold, SD 57536

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Outdoor Pool Earthwork
Infrastructure
Results
$1,114,745 est. value
Pierre, SD

Watermain Extension
Infrastructure
Results
SD

Urban Grading, Curb and Gutter, ADA, Signals, Storm Sewer, Lighting, AC Surfacing
Infrastructure
Conception
$12,766,000 CJ est. value
Harrold, SD 57536

RFP Engineering - A and E Services Hill, Water Replacement Penitentiary
Infrastructure
Post-Bid
$500,000 CJ est. value
Pierre, SD 57501

2022 Pipe, Valves, Fittings and Hydrants
Infrastructure
Results
Pierre, SD

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$3,789,000 CJ est. value
Harrold, SD 57536

RFP Engineering - Hill-Inside, Storm Sewer Upgrades
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Pierre, SD 57501

Black Hills Drive Extension
Infrastructure
Results
$500,000 est. value
SD

Steamboat Park Development - City of Pierre
Infrastructure
Conception
$2,000,000 CJ est. value
Pierre, SD 57501

Last Updated 10/05/2022 01:03 PM
Project Title

RFP Design - Architectural and Engineering Services Grounds ,Stormwater,Water Line,Sewer

Physical Address View project details and contacts
City, State (County) Pierre, SD 57501   (Hughes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 5, 2022, information regarding award and award date has not been disclosed. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: The project will include stormwater piping replacement with an added retention system and water line replacement on the South Dakota Mines campus. A new sewer/septic and storm water infrastructure work to be completed at a location near Nemo, SD. The construction budget for the project is $3,200,000.00, but be advised that this number is subject to change. The project will need to be designed and ready for bid advertisement by the November 2022. Construction is anticipated to occur May-August 2023 or in phases if needed. Firms desiring to be considered for providing professional services for this project should send a statement of interest that outlines qualifications and experience for this project. Statements of Interest should at a minimum include the following: 1. Specialized expertise, capabilities, experience in commissioning similar facilities, and technical competence as demonstrated by the team's capabilities, proposed approach and methodology to meet the project requirements. (30%) 2. Resources available to perform the work, including any specialized services, within the specified time limits for the project. Include resumes of all personnel, including sub-consultants who will be assigned to this project for the entire duration. (30%) 3. Record of past performance, including price and cost data from previous projects, quality of work, ability to meet schedules, cost control, and contract administration. (20%) 4. Availability to project locale. (5%) 5. Familiarity with project locale. (5%) 6. Proposed project management techniques. (5%) 7. Ability and project history in handling special project constraints. (5%) A technical review committee will select the firm based on the criteria shown. The committee respectfully requests that statements of interest be limited to 25 pages or less. This is not a requirement, merely a request. The method of Contractor Selection has not been determined at this time.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents