Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

500 West - 1560 South to 920 South
Alteration
Conception
$1,800,000 est. value
Provo, UT 84601

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

RFP Design - Comprehensive Therapy Building - Utah State Developmental Center
New Construction, Infrastructure
Bidding
$30,000,000 CJ est. value
American Fork, UT 84003

RFP Construction Manager - Construction Manager / General Contractor for CWP Vineyard Wellfield Groundwater Polishing Project
New Construction, Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Vineyard, UT 84059

Sanctuary
New Construction, Infrastructure
Sub-Bidding
$155,000,000 CJ est. value
Lehi, UT 84043

River Bottom Improvement Project Prequalification
Post-Bid

Woodland Hills Waterline Replacement - Phase 2A
Infrastructure
Post-Bid
Woodland Hills, UT

Power Department Building
Results
Salem, UT 84653

Power Building Site Work
Results
Salem, UT 84653

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

Daybell Warehouse Addition
Addition, Demolition, Infrastructure - 1,791 SF
Pending Verification
$400,000 CJ est. value
Spanish Fork, UT 84660

24" Transmission Line 1730 North - 1500 West to 1680 North Geneva - City of Provo
Infrastructure
Conception
$8,000,000 est. value
Provo, UT 84603

Last Updated 07/28/2022 10:06 AM
Project Title

2022 Eagle Mountain Replacement Collars

Physical Address View project details and contacts
City, State (County) Eagle Mountain, UT 84005   (Utah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $57,881 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction work, in general, consists of the following: The removal and replacement of damaged and/or defective concrete manhole collars and concrete water valve collars. Work shall also include any damaged and/or defective manhole metal rings and water valve towers. Contractor shall be responsible for the removal and replacement, haul-off of waste materials, concrete testing, traffic control, metal plating or rapid set concrete and SWPPP. This project does not require a bid bond.

Details

Division 03 - Concrete.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents