Similar Projects
Reported | 02/17/2021 12:00 AM |
Project Title | Airport Tower Equipment |
Physical Address | View project details and contacts |
City, State (County) | Denton, TX (Denton County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Procure, install and integrate new VCCS. 2. Coordinate, install and integrate the radios, 4 wire shout, 2 digit dial up and commercial phone lines and data lines and GPS clock as required to the Approach Control Center (ACC) and nearby ATCTs as required into the VCCS. 3. Procure, tune and install new Jotron radios, Standby for Ground, Local and ATIS frequencies and Antenna Changeover Unit. 4. Provide, install and integrate ATIS recorder. 5. Provide and install ATIS ASOS Interface Unit 6. Remove existing push button Voice Switches - two positions. Fabricate and Install Console Plates and access panel. Modify existing cab console turrets to accommodate new VCCS Touch Entry Devices (TED) and Monitor Stands. See drawing in Appendix B. 7. Install Slotted Angle around perimeter of roof on existing handrails and redress antenna cable in a suitable manner. 8. Train ATCT controllers on the operation of the new equipment. 9. Provide VCCS Testing Certification Factory Acceptance and Site Acceptance. 10. Procure and provide spares for all systems. 11. Provide warranty agreements. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |