Similar Projects
Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

The Colony MUD 1C Section 2 Rosewood Path Extension
Infrastructure
Bidding
$547,869 CJ est. value
Bastrop, TX 78602

City of Lufkin - Whitehouse Elevated Storage Tank Rehabilitation (2.0 Million Gallons)
Infrastructure
Bidding
$700,000 CJ est. value
Lufkin, TX 75901

Stone Creek Ranch
New Construction, Infrastructure - 521,500 SF
Sub-Bidding
$50,000,000 CJ est. value
Elgin, TX 78621

Rockport Harbor Front Marina Commercial/Marina Development Sites
Post-Bid
Rockport, TX

Angelina County Waste Management Center - Sector L Liner
Infrastructure
Post-Bid
$1,009,000 est. value
Lufkin, TX

Culvert Installation & Road Maintenance Services
Results
Lufkin, TX 75904

Demolition and Asbestos Abatement of 2 Residential Structures
Demolition
Results
Less than $61,575 est. value
Temple, TX 76504

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Line 204 Studios-Stage B
New Construction, Infrastructure - 25,597 SF
Pending Verification
$8,000,000 CJ est. value
Bastrop, TX 78602

Yerico Manufacturing Warehouse
New Construction, Infrastructure - 30,000 SF
Design
$2,500,000 CJ est. value
Elgin, TX 78621

Roadway Reconstruction at Rattlesnake Point Road
Infrastructure
Bidding
$3,000,000 CJ est. value
Rockport, TX 78382

Drainage Improvement Project
Infrastructure
Post-Bid
Smithville, TX

Dry Creek Bridge Erosion Repair Project
Results
Cedar Creek, TX 78612

Last Updated 10/14/2022 02:33 PM
Project Title

Raw Water Pond Reconstruction

Physical Address View project details and contacts
City, State (County) Goldthwaite, TX 76844   (Mills County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The clearing of vegetation and grading in an existing raw water pond and the installation of a synthetic pond liner. The project to be constructed will be financed in whole or part, by federally awarded funds to the City of Goldthwaite from the American Rescue Plan Act and is subject to all applicable Federal and State laws and regulations. Attention is called to the fact that not less than, the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual orientation, gender identity, or national origin. Adherence to the grant recipients Section 3 Policy is required for all contracts and subcontracts. SAM.gov registration is required to Bid. All contractors/subcontractors that are debarred, suspended, or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project. This will be verified upon receipt of bid and prior to the award. Minority Business Enterprises, Small Business Enterprises, and Women Business Enterprises, and Historically Underutilized Business firms are encouraged to submit bids. The City of Goldthwaite reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the City of Goldthwaite for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidders qualifications prior to the contract award. The lobbying certification must be submitted with the bid packet to be considered complete and responsive. This project is being supported, in whole or in part, by federal award to the City of Goldthwaite by the U.S. Department of the Treasury. The City of Goldthwaite is an Equal Opportunity Employer.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents