Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

Construct West End Zone Club Space - University of Kentucky
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Lexington, KY 40508

Asphalt Surface With Grade and Drain - US 25W
Infrastructure
Design
$7,629,421 CJ est. value
Williamsburg, KY 40769

Asphalt Resurface with Grade and Drain - US 60
Infrastructure
Design
$975,271 CJ est. value
Marion, KY 42064

Sports Complex - Light Pole Installation Project
Infrastructure
Bidding
$50,000 CJ est. value
Catlettsburg, KY 41129

Barkley Dam Replace Foundation Drainage System
Infrastructure
Bidding
$1,000,000 CJ est. value
Grand Rivers, KY 42045

Engineering Services for Bridge Design - Buffington Bridge Replacement
New Construction, Renovation
Post-Bid
Elsmere, KY

Sewer Pump Station
Renovation
Post-Bid
Bowling Green, KY

Site Clearing
Results
Covington, Taylor Mill, KY 41015

Baseball Field Backstop Safety System
Results
Union, KY 41091

Murray-Calloway County Hospital Re-Roofing
Renovation
Construction
Murray, KY 42071

Beaumont Middle School - Fayette County Board of Education
Renovation, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Lexington, KY 40504

Brownsboro Road Mixed Use
New Construction, Infrastructure - 9,775 SF
Pending Verification
$12,000,000 CJ est. value
Louisville, KY 40241

Southern Middle School - Fayette County Board of Education
Renovation, Infrastructure
Conception
$13,724,837 CJ est. value
Lexington, KY 40517

Asphalt Resurfacing - Various Routes in Leslie County
Infrastructure
Design
$633,728 CJ est. value
Big Laurel, KY 40808

Last Updated 08/24/2022 09:31 AM
Project Title

East Casey County Water District - Contract 1 - 2022 Pump Stations

Physical Address View project details and contacts
City, State (County) Liberty, KY 42539   (Casey County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacing two (2) water booster pump stations and one (1) water booster pump station upgrade with all necessary appurtenances. If funds remain, a third water booster pump station will be replaced. Construction of Contract 1 - 2022 Pump Stations Contract 1 will include upgrading the existing Shugars Hill Pump Station, replacing the existing Henson Creek Hydro Pneumatic Pump Station and Walnut Hill Pump Station with above ground pump stations, and if funds remain, Alternate No. 1, which includes replacing the existing Crossroads Pump Station with an above ground pump station. All bidders shall submit with their bid a Bid Bond in amount of not less than five (5) percent of the base bid. No Bidder may withdraw his bid for a period of ninety (90) days after the scheduled Bid Opening Date. The Bidder awarded the contract shall execute a 100% Performance Bond and a 100% Payment Bond and shall furnish insurance as required, in the General Conditions. The Bidder awarded this contract shall complete this project within 150 calendar days after date of authorization to start work. Liquidated damages will be assessed at $800 per calendar day Bidders must comply with the President's Executive Order Nos. 11246 and 11375, which prohibit discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must comply with Section 3, Section 109, and Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act and the contract Work Hours Standard Act. Bidders must certify that they do not, and will not, maintain or provide for their employees any facilities that are segregated on a basis of race, color, creed, or national origin. Any bid that is obviously unbalanced may be rejected. The District reserves the right to reject any and all bids and waive informalities.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents