Similar Projects
Erosion Control and Stormwater Management Contractor
Infrastructure
Post-Bid
Aurora, CO

Canyons Filing 2, 1st Amendment Lot Development Construction Project
Infrastructure
Post-Bid
Centennial, CO

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

Englewood Service Center Drainage and Parking Lot Improvements
Results
Less than $500,000 est. value
Englewood, CO

Pond 331 Recharge
Infrastructure
Post-Bid
Greenwood Village, CO 80112

Belleview-Clarkson Drainage Improvements
Results
Greenwood Village, CO

Construction of the Filing 10, Filing 11, and Fultendale St. Roadways
Infrastructure
Post-Bid
Aurora, CO 80040

2021 Sanitary Sewer Cipp Rehabilitation Project
Results
Greenwood Village, CO

Goldsmith Gulch Final Phase Improvements - Huntington-Caley Open Space
New Construction, Infrastructure, Alteration
Post-Bid
Greenwood Village, CO 80111

Design Services for Cherry Creek Reservoir Shoreline Stabilization ESS and Tl PRFS
Results
CO

2022 Alley Grading and Stabilization - Zone 3
Infrastructure, Alteration
Post-Bid
Englewood, CO 34223

Retaining Wall Installation Project
Results
Less than $100,000 est. value
CO

Utah Park - Sidewalk and Bridge Abutment Repairs
Renovation, Infrastructure
Post-Bid
$300,000 to $335,000 est. value
Aurora, CO 80012

Crossroads Overlot Grading
Results
Greenwood Village, CO

Removal of Portions of Present Structure, Removal of Fence and Facing Block
Results
Denver, CO 80239

Last Updated 04/29/2022 05:33 AM
Project Title

Confluence Natural Area Restoration

Physical Address View project details and contacts
City, State (County) CO 80018   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $475,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Restoration and reclamation of the sand and gravel mine. Proposed improvements include but are not limited to earthwork, erosion control, and restoration seeding. The project includes, but is not limited to the supply and installation of the following: 1. Demolition, removal and site preparation 2. Erosion & sedimentation control 3. Earthwork and grading within confined limits of construction, near wetlands 4. Wetland restoration with prescribed seed mixes and methods 5. Upland grassland restoration with prescribed seed mixes and methods 6. Soil preparation for wetland and upland native seeding 7. Lowering of a power utility pole following grading

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents