Reported | 07/19/2021 11:11 AM |
Project Title | Construction Manager at Risk Wastewater Treatment Facility Improvements |
Physical Address | View project details and contacts |
City, State (County) | Platteville, CO 80651 (Weld County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | |
Project Status | Construction Commenced June 2021 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project includes expansion of the existing wastewater treatment facility, including but not limited to construction of a new headworks building with screening and grit removal, a sequencing batch reactor (SBR) with two basins, effluent equalization tank, aerobic digester, operations building, and UV disinfection building. Work also includes installation of the following equipment: blowers, decanters, sludge pumps, aeration grids, and all other equipment required for a fully functioning SBR; site piping, process piping, UV disinfection system, valves and appurtenances. Work to include all associated site work related to the project including but not limited to grading, storm drainage, paving, and seeding. In addition, work consists of installation of all electrical conduit and wiring, new electrical service, power panel, motor control centers, programmable logic controllers, and controls and integration. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |