Similar Projects
CHRL Pump Station 1a, 2, & 3
New Construction
Conception
$750,000 est. value
WA

Stormwater Repairs Phase III Construction
Alteration
Design
$5,200,000 est. value
WA

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

Environmental Consulting Services for 2021 Stormwater Code Amendments
Renovation, Alteration
Post-Bid
$75,000 est. value
Sammamish, WA 98075

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

North Mercer Island and Enatai Interceptor Upgrade - Pump Station Improvements
Alteration
Post-Bid
Mercer Island, WA 98040

Richmond Beach Pump Station Low Voltage Switchboard and MCC Replacement
Alteration
Results
$2,558,000 est. value
Seattle, WA 98177

D Street SE and 23Rd Street SE Storm Improvements Project
Infrastructure
Post-Bid
$5,295,000 est. value
Auburn, WA 98002

Airlift Pump Station 38 Replacement
Renovation
Results
$1,300,000 est. value
Seattle, WA 98116

Tukwila Macadam Road South Water Main Upgrade and Sidewalk Improvements
Infrastructure
Post-Bid
Tukwila, WA 98178

Maintenance and Repair of Surface Water Facilities Work Order
Infrastructure
Results
WA

Raincity Partnerships
Infrastructure
Post-Bid
Seattle, WA

Somerset Reservoir No. 1 Decommissioning Project
Infrastructure
Results
Bellevue, WA

North Seattle Mobility Improvements Package One
Infrastructure, Alteration
Results
Seattle, WA

Reported 03/09/2022 12:00 AM
Project Title

Pump Station 26 and Citywide Storm Water Safety SCADA Improvements

Physical Address View project details and contacts
City, State (County) Shoreline, WA   (King County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall include, but is not limited to, furnishing all labor, equipment, and materials necessary to construct the replacement stormwater Pump Station 26 and the Linden, Palatine, Ronald Bog, Pan Terra, Serpentine, and PS-25 Pump Station improvements, including but not limited to storage and infiltration systems, stormwater pretreatment system, civil and mechanical improvements, electrical and control systems, new electrical utility services, site and frontage improvements, restoration of public rights-of-way and private property, and site landscaping and amenities.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Precast Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents