Similar Projects
UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

Zone 3 North 3 MG Reservoir Project
Results
Less than $3,200,000 est. value
West Jordan, UT 84088

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Precast Stormwater Box
Results
Less than $7,000 est. value
Riverton, UT

Traverse Ridge Storm Drain
Post-Bid
Draper, UT

Lone Peak Parkway - 12000 South Culvert Extension
Results
Less than $300,000 est. value
Draper, UT 84020

Segmented Pipe Liner
Term Contract
Post-Bid
UT

2550 South 7200 West to 8000 West Surcharge and Culvert Package
Results
$2,800,000 to $3,500,000 est. value
Salt Lake City, UT 84190

10th East Senior Center Retaining Wall
Post-Bid
Salt Lake City, UT 84114

Road and Drainage Improvements - Central Avenue
Results
$300,000 to $400,000 est. value
Millcreek, UT 84107

Hog Hollow Soil Repair
Post-Bid
Less than $175,000 est. value
Herriman, UT 84065

Anna Caroline Drive Bridge
Results
Less than $443,240 est. value
West Valley City, UT 84119

I-80; Culvert Rehabilitation
Post-Bid
$500,000 to $1,500,000 est. value

Last Updated 12/11/2020 05:36 PM
Project Title

Concrete Water Control Structures

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For concrete water control structures of various dimensions and flow capacities. Specifically, we require structures constructed with 24”, 36”, 48”, or 60” HDPE corrugated cast in pipe stubs, dimensions will vary based on size of pipe (figure 1). Structures need wing-walls on both sides to help prevent erosion (Figure 1). Note, wing- walls in figure 1 only shown on one side in order to keep the drawing simplified. Structures should be available in a variety of heights ranging from 4’ to 8’ depending on need. Concrete should be at least 4300 psi, and a skeleton of 3/8” rebar should be used for the structures (including the base). Either a male or female corrugated pipe stub should be cast into the structure (the male or female end of the stub needs to be exposed so it can attach to another length of pipe). The pipe should stub out 10’ from structures. Structures should be cast with a mechanism on each side that allows us to hook a chain to them in order for lifting (such as a large cast in U-bolt).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Common Work Results for Utilities, Utility Structures, Precast Concrete Utility Structures, Storm Drainage Utilities.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Waterway Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents