Similar Projects
Van Nuys and Voss Mixed Use Development
New Construction, Infrastructure, Alteration - 86,550 SF
Design
Los Angeles, CA 91405

Valley Day-Use Parking Phase II
Alteration
Design
$3,000,000 to $5,000,000 est. value
CA

Master As-Needed Agreement M14 Curb Ramp Construction
Infrastructure
Bidding
$1,000,000 est. value
San Francisco, CA

Rapid Corridors San Pablo Avenue Project
Infrastructure
Bidding
Oakland, CA 94622

De Anza Park Pathway Renovation
Infrastructure
Post-Bid
$546,000 est. value
Sunnyvale, CA 94087

2021 Pavement Rehabilitation
Alteration
Post-Bid
$500,000 est. value
Ross, CA 94957

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Marin County Jail Booking Area Barrier Removal for ADA Compliance
Infrastructure
Results
$159,249 est. value
San Rafael, CA 94903

Power Inn Road Bicycle and Pedestrian Improvement
Infrastructure
Bidding
$2,825,000 est. value
Sacramento, CA 95811

Parking Pay Station Site Improvements Lot J
Infrastructure
Post-Bid
$20,000 est. value
Rohnert Park, CA 94928

Fancher Creek Trail
Infrastructure
Results
$669,877 est. value
CA

Hillside Boulevard Pedestrian Crossing Enhancements
Infrastructure
Bidding
South San Francisco, CA 94083

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Construct Retaining Wall, Replace Concrete Sidewalk and HMA Paving
Infrastructure
Bidding
$2,640,000 est. value
CA

Reported 01/21/2022 12:00 AM
Project Title

Removal and Replacement of Sidewalk

Physical Address View project details and contacts
City, State (County) Rio Vista, CA   (Solano County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of, but is not limited to all labor, material, equipment and performance of operations necessary to accomplish the installation of remove and replacement handling cap ramps, remove and replace curb, gutter, and sidewalk, install thermoplastic striping, install warning signs, install pedestrain safety elements, and install patch paving, traffic control and all other work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents