Similar Projects
Parkview Gardens IV
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Caledonia, WI 53108

Highway 20 Water Main - West Boulevard to Marquette (Department Of Transportation) - City of Racine
Infrastructure
Conception
$1,000,000 CJ est. value
Racine, WI 53403

Case High School 2020 Bond - Racine Unified School District
Build-out, Infrastructure
Design
$31,268,754 CJ est. value
Racine, WI 53403

Knapp Elementary School - 2020 Bond - Racine Unified School District
Infrastructure, Renovation
Design
$201,000 CJ est. value
Racine, WI 53403

Northwest Highway (STH 83), STH 20 to IH 43; Northwest Highway (STH 83), W. Boxhorn Drive to Wolf Run
Infrastructure
Bidding
$8,000,000 CJ est. value
Burlington, WI 53105

CTH D, Heritage Road to 753 Ft. W. of State Street
Infrastructure
Bidding
$3,000,000 CJ est. value
Burlington, WI 53105

2021 CCTV Inspection
Infrastructure
Post-Bid
$190,000 est. value
Racine, WI

2022 Assessable Streets and Alleys
Infrastructure
Post-Bid
$2,000,000 est. value
Racine, WI

CPC 2 Elevator Replacements and New Mechanical Room
Renovation
Results
Caledonia, WI 53126

Campus Site Work
Infrastructure
Results
$350,000 est. value
Union Grove, WI 53182

W. 6th Street, Bridge Over Root River, P-51-0709
Infrastructure
Construction
$6,734,483 CJ est. value
Racine, WI 53404

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Washington Avenue Multi-Family
Demolition, New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Racine, WI 53403

North Beach Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Racine, WI 53402

Community Pathways Campus / Jefferson - 2020 Bond - Racine Unified School District
Renovation
Design
$2,029,927 CJ est. value
Racine, WI 53403

Last Updated 01/06/2023 12:07 PM
Project Title

Goodland Elementary School Remodel - 2020 Bond - Racine Unified School District

Physical Address View project details and contacts
City, State (County) Racine, WI 53406   (Racine County)
Category(s) Education, Heavy and Highway, Sewer and Water
Sub-Category(s) Elementary School, Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $14,824,036 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 6, 2023, a construction manager has been selected and this project is in the planning phase. Information regarding an architect has not been released. Construction is expected to begin in June of 2025 and complete in August of 2026. Bond fund $598 million of work over 30 years GOODLAND ELEMENTARY SCHOOL The referendum would provide the funding needed to make the following improvements at Goodland: SAFETY & SECURITY: • Create secure entrance and renovate administrative area • Create parent drop-off loop • Update for ADA-compliant access • Replace fire alarm and clock systems • Install security cameras and emergency backup generator LEARNING SPACES: • Create new STEM Lab • Renovate student support areas in East Wing • Create dedicated Sensory Room in West Wing • Replace coat hooks with cubbies NEW ADDITIONS: • Relocate and expand kitchen and serving stations, construct new receiving area • Add Greenhouse INFRASTRUCTURE: • Refresh building interiors (LED lighting, flooring, ceilings, casework, paint walls) • Address building maintenance (doors, HVAC updates, exterior masonry, roofing, concrete/asphalt, site drainage and retrocommissioning) The 2020 bond referendum was passed and approved by the voters on April 7, 2020.

Details

Elementary School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents