Similar Projects
Last Updated | 01/19/2023 05:06 PM |
Project Title | 2022 Capital Improvement Project - Contract 3 Electrical Work |
Physical Address | View project details and contacts |
City, State (County) | Blauvelt, NY 10913 (Rockland County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $77,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The South Orangetown Central School District (Owner) invites bids for "2022 Capital Improvement Project" which involves construction at the South Orangetown Middle School 160 Van Wyck Rd Blauvelt, NY 10913, Tappan Zee High School 15 Dutch Hill Rd. Orangeburg, NY, and Cottage Lane Elementary 120 Cottage Lane Blauvelt, NY 10913. SED # 50-03-01-06-0-006-031, 50-03-01-06-0-010-021, 50-03-01-06-0-013-028 The Work of the project will be let for the following Contracts: Contract 3 Electrical Work Any Bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Please note; REVplans (cplteamplanroom.com) is the designated location and means for distributing and obtaining all bid package information. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. The Provider takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may be issued. All bid addenda will be transmitted to registered plan holders via email and will be available electronically. Plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. A Bidder, upon 1) making the deposit required for the Bid Documents, 2) submitting a Proposal accompanied by a certified check or other security in accordance with the requirements contained in the plans and specifications and public advertisement for bids, and 3) returning the plans and specifications used by such Bidder in good condition within thirty (30) days following the award of the Contract, or rejection of the Bid, shall have returned to them the full amount of the deposit for one copy of the plans and specifications. In addition, the Bidding Documents contain detailed requirements for the qualification of Bidders. These include, among other things, rigid bonding and insurance requirements, financial statements, bank references, lists of lawsuits, arbitrations or other proceedings in which the Bidder has been named as a party, a statement of surety's intent to issue Performance and Payment Bonds, and a description of other projects of similar size and scope completed by the Bidder. Bids shall be prepared as set forth in "INSTRUCTIONS TO BIDDERS", enclosed in a sealed envelope bearing on its face the name and address of the Bidder and the title of the Work to which the bid enclosed relates. Each Bidder shall deposit with its bid, security in an amount not less than five percent (5%) of the base bid in the form and subject to the conditions provided in the "INSTRUCTIONS TO BIDDERS." No Bidder may withdraw his bid within forty-five (45) days after the actual bid opening. The Owner reserves the right to waive any and all informalities in, or to reject, any or all bids. The Owner further reserves its right to disqualify Bidders for any material failure to comply with the "INSTRUCTIONS TO BIDDERS". |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |