Similar Projects
Residential DHP Installation
Infrastructure
Post-Bid
WA

Mechanical MATOC
Term Contract
Post-Bid
$2,000 to $500,000 est. value
WA

Weatherization - Residential Ductless Heat Pump Installation 2
Alteration
Results
WA

County-City Building Property Room Exhaust Addition
Alteration
Results
$100,000 est. value
Tacoma, WA 98402

Repair of Emergency Boiler
Term Contract, Alteration
Post-Bid
$100,000 to $250,000 est. value
Tacoma, WA 98431

WCCW MSU Building Climate Control Improvements
Alteration
Results
$860,000 to $1,010,000 est. value
Gig Harbor, WA 98332

MHR Urgent Residential HVAC
Alteration
Post-Bid
Tacoma, WA

Weatherization Residential Insulation 8550
Alteration
Results
Eatonville, WA

Air Filters for HVAC
Term Contract, Alteration
Post-Bid
Tacoma, WA

WX Residential Weatherization 8556
Alteration
Results
Puyallup, WA 98371

128Th St Booster Station And Generator
New Construction, Infrastructure, Alteration
Post-Bid
$1,945,000 to $2,145,000 est. value

WX Residential Weatherization 8567
Alteration
Results
Puyallup, WA

HVAC Maintenance and Repair (Rebid)
Term Contract
Post-Bid
$1,000,000 CJ est. value
Tacoma, WA 98405

Residential Weatherization 8573
Alteration
Results
Bonney Lake, WA 98391

Sprinker Ice Rink Refrigeration Maintenance
Alteration
Post-Bid
Tacoma, WA 98444

Last Updated 03/24/2023 06:08 PM
Project Title

Fire Station 11 and 13 HVAC Improvements

Physical Address View project details and contacts
City, State (County) Tacoma, WA 98404   (Pierce County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,038,494 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION A. The work of the project is defined by the Contract Documents and generally consists of the following: Fire Station 11 and 13 boiler replacement and HVAC installation - consists of the replacement of building systems within the Tacoma Fire Stations 11 and 13 in accordance with the permitted drawings completed by KMB architects and associated consultant team, located in Tacoma, Washington. i. Demo of existing boiler, fuel oil tank, fuel oil lines, and associated piping per plans ii. Installation of new heat pumps, air handlers, and duct work per enclosed plans iii. Modifications to existing windows at locations shown in plans to accommodate HVAC air supplies and exhaust.Fire Station 11 and 13 HVAC Installation 01 11 00 - 2 SUMMARY OF WORK iv. The installation of new 3-phase electrical supplies by Tacoma Power including a new power pole and transformer and running electrical supplies to the contractor provided new weather head and meter base and additional electrical components as specified in attached plans at both Fire Station 11 and 13. v. Installation of new electric meters, panels and wiring to support mechanical system as shown in plans. vi. New panels to feed existing on-site panels. vii. Installation of all associated conduits per plans. viii. Hazardous material abatement - Provide hazardous material abatement in the area of work. Refer to Reports included in the Project Manual. B. Provide materials, labor, equipment, temporary facilities and construction expertise as required to complete the Project as shown in the Contract Documents. C. Contractor represents that he has carefully examined prior to bidding, Contract Documents and site conditions, and understands the character, quality and quantity of work called for and conditions affecting the Contract Work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents