Similar Projects
Last Updated | 03/24/2023 06:08 PM |
Project Title | Fire Station 11 and 13 HVAC Improvements |
Physical Address | View project details and contacts |
City, State (County) | Tacoma, WA 98404 (Pierce County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,038,494 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | PROJECT DESCRIPTION A. The work of the project is defined by the Contract Documents and generally consists of the following: Fire Station 11 and 13 boiler replacement and HVAC installation - consists of the replacement of building systems within the Tacoma Fire Stations 11 and 13 in accordance with the permitted drawings completed by KMB architects and associated consultant team, located in Tacoma, Washington. i. Demo of existing boiler, fuel oil tank, fuel oil lines, and associated piping per plans ii. Installation of new heat pumps, air handlers, and duct work per enclosed plans iii. Modifications to existing windows at locations shown in plans to accommodate HVAC air supplies and exhaust.Fire Station 11 and 13 HVAC Installation 01 11 00 - 2 SUMMARY OF WORK iv. The installation of new 3-phase electrical supplies by Tacoma Power including a new power pole and transformer and running electrical supplies to the contractor provided new weather head and meter base and additional electrical components as specified in attached plans at both Fire Station 11 and 13. v. Installation of new electric meters, panels and wiring to support mechanical system as shown in plans. vi. New panels to feed existing on-site panels. vii. Installation of all associated conduits per plans. viii. Hazardous material abatement - Provide hazardous material abatement in the area of work. Refer to Reports included in the Project Manual. B. Provide materials, labor, equipment, temporary facilities and construction expertise as required to complete the Project as shown in the Contract Documents. C. Contractor represents that he has carefully examined prior to bidding, Contract Documents and site conditions, and understands the character, quality and quantity of work called for and conditions affecting the Contract Work. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |