Similar Projects
Main Lift Pump Station Emergency Repairs
Renovation
Results
Davenport, IA 52802

Southbridge Lift Station Improvements, Bid Package No. 1 - Lift Station
New Construction, Infrastructure
Results
Less than $1,210,000 est. value
Adel, IA

Mount Pleasant Northeast Lagoon Conversion
New Construction, Infrastructure
Post-Bid
Mount Pleasant, IA

Meter Buildings
Renovation
Results
$1,800,000 to $2,250,000 est. value
Hull, Sioux Center, IA - Beresford, SD

USACE Cedar Lake Pump Station
Conception
$23,300,000 est. value
Cedar Rapids, IA 52407

Pump Station and Ground Storage Reservoir
New Construction, Infrastructure
Results
$1,300,000 est. value
Ashton, IA

Iowa Wastewater Treatment Facility 2021
New Construction
Post-Bid
$1,805,000 est. value
Miles, IA

Auburn Court Lift Station Abandonment
New Construction, Infrastructure
Results
Bettendorf, IA

Grandview Booster Station Improvements
New Construction
Results
Sioux City, IA 51104

Green Valley Park Campground Sewer Main
Renovation, Infrastructure
Results
Less than $560,000 est. value
Union, IA

Xenia Rural Water District Boone East Pump Station
New Construction
Results
Boone, IA 50036

Wastewater Treatment Plan Improvements
Renovation
Results
$2,686,000 est. value
New Albin, IA

Southbridge Lift Station Improvements, Bid Package No. 2 - Force Main
New Construction, Infrastructure
Results
Less than $790,000 est. value
Adel, IA 50003

WRA Birdland Pump Station Improvements
Renovation
Bidding
$15,344,000 est. value
Des Moines, IA 50317

Sheldon Water Tower
New Construction, Infrastructure - 1,100 SF
Post-Bid
$3,600,000 to $3,800,000 est. value
Hospers, IA 51238

Last Updated 02/22/2022 09:38 AM
Project Title

Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Rockwell City, IA 50579   (Calhoun County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Old Highway 20 Lift Station Improvements Improvements to the existing lift station including new above ground valve vault, two 220 GPM submersible effluent pumps, process piping, controls, generator, and all other miscellaneous work to complete the project. Tonawanda Street Lift Station Improvements Replacement of the existing lift station with a concrete wet well, above ground valve vault, two 300 GPM submersible effluent pumps, process piping, controls, generator, and all other miscellaneous work.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents