Similar Projects
Country Club Expansion
Renovation
Conception
Glenview, IL 60025

Clark Pool Rehabilitation
Bidding
Chicago, IL 60644

General Contractor Services
Term Contract
Post-Bid
Chicago, IL

RFI-Assessment of Existing Commercial Swimming Pool
Term Contract
Post-Bid
Batavia, IL 60510

Spring Lake Pool
Results
$610,000 est. value
Rochelle, IL 61068

Water Slide Resurfacing Services
Results
Lincolnwood, IL 60712

Club House & Pool Improvements
New Construction, Renovation
Construction
North Riverside, IL 60546

The Oak Brook Commons Mixed Use
New Construction
Construction
$500,000,000 est. value
Oak Brook, IL 60523

Construction/Renovation/Maintenance Services
Term Contract
Post-Bid
Rockford, IL 61102

Gridley Pool Mechanical Building Modifications
Results
Gridley, IL 61744

Kewanee Physical Therapy Facility Therapy Pool
Addition
Post-Bid
Kewanee, IL 61443

Centennial Park Aquatic Center VGBA Upgrades
Results
Orland Park, IL 60462

Vaughan Athletic Center Therapy Pool Re-Plaster
Post-Bid
Aurora, IL 60506

Repair HVAC and Pool - Jacoby Dickens Center
Results
Less than $4,000,000 est. value
Chicago, IL 60628

2021 Hidden Creek Aquapark Slide Resurfacing
Post-Bid
Highland Park, IL 60035

Last Updated 12/15/2020 02:55 PM
Project Title

DHS- SP- Kiley- Pool Filter Replacement and Paint- PIF- FY21

Physical Address View project details and contacts
City, State (County) Waukegan, IL 60085   (Lake County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Provide Materials, Labor and Equipment to Replace Two Triton II Swimming Pool Water Filters and Associated Piping, System Configuration Valves, and Gauges. 2. Disconnect, remove and properly dispose of two existing pool filters, contents, associated piping, valves and gauges. 3. Install new filters of same capability (pool is 36,000 gals) to ensure a maximum turnover rate of 6 hours. Filters shall be certified to comply with NSF Standard 50. An official certification label from the certifying agency shall be permanently affixed to the filter. Pressure gauges indicating inlet and outlet pressures of ach filter shall be replaced / installed. Observable free-fall discharge sight glass shall be replaced / installed. Filter media for the filters shall be as specified by the filter manufacturer.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents