Similar Projects
Page Public Library Carpet Replacement Project
Alteration
Bidding
Page, AZ 86040

Bldg 72 Carpet
Term Contract
Bidding
Tucson, AZ 85707

SDFC Strength Equipment and Flooring
Post-Bid
Tempe, AZ 85287

S201--SaniGlaze Floor Maintenance
Post-Bid
Phoenix, AZ 85012

Carpet Removal & Installation and Tile Abatement
Results
Phoenix, AZ

Flooring Project at Kennedy Elementary School
Results
Superior, AZ 85173

Smith's Grocery Store #188
Construction
Lake Havasu City, AZ 86403

Public Works Building Flooring
Post-Bid
Chino Valley, AZ

Carpet Tiles and Installation Bldg 136
Results
Tucson, AZ 85707

Electrical and Flooring Supply and Installation
Post-Bid
Glendale, AZ 85051

Carpet Materials and Installation Bldg 130
Results
Tucson, AZ 85707

Flooring Replacement at Superior High School
Post-Bid
Superior, AZ 85173

Carpet Materials and Installation Bldg 12
Results
Tucson, AZ 85707

Flooring Requirement
Post-Bid
Tucson, AZ

LRS Epoxy Floor (Vehicle Maintenance Bay)
Results
Phoenix, AZ 85034

Last Updated 09/22/2021 04:03 PM
Project Title

Greatroom Dorm Renovation Project

Physical Address View project details and contacts
City, State (County) AZ   (Apache County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Indian Small Business Economic Enterprise (ISBEE) Set-Aside. The contractor shall furnish all supervision, labor, materials, equipment, transportation and insurance to prepare the existing floor base and install 1,720 square feet (SF) of new 1/8” VCT throughout nine rooms, including the installation of 425 linear feet (LF) of rubber wall base over all newly installed VCT. Additionally, an area of room 210, kitchen, will need approximately 138 square feet (SF) of water-damaged flooring replaced. Newly installed underlayment plywood should be a consideration where required. Minimal furniture lifting and moving will be required by the contractor. The existing base floor is wood. Building floor plans are attached for reference to room numbers, dimensions and linear footage

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents