Similar Projects
2021 Utility Cut Asphalt Repairs
Infrastructure
Bidding
Jacksonville, NC

Asphalt Repair Project FY20
Post-Bid
Jacksonville, NC 28541

Blue Ridge Parkway
Post-Bid
$85,000,000 est. value

Onslow Asphalt Tier
Results
NC

Training Road Repairs and Debris Removal, Phase III
Results
$10,000,000 to $25,000,000 est. value
Camp Lejeune, NC 28547

Repair Pavement Building AS 4108
Post-Bid
$100,000 to $250,000 est. value
Camp Lejeune, NC

Installation of Drive Lane Extension Swansboro Middle School
Results
Less than $34,690 est. value
Swansboro, NC 28584

Rfb-Streets Division Asphalt Repair Project Fy21
Post-Bid
Jacksonville, NC

Design-Bid-Build (DBB) Construction Project for P1346B/P1280B, Birch Street Road Improvements/Birch Street North at Marine Corps Base Camp Lejeune, North Carolina
Results
$5,000,000 to $10,000,000 est. value
Camp Lejeune, NC

Sidewalk Routing and Sealing Project FY21
Post-Bid
Jacksonville, NC

Elizabeth Street Asphalt Repair Project FY20
Results
Jacksonville, NC 28541

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Milling, Resurfacing, and Shoulder Grading
Results
NC

FY 19 Street Rehabilitation Project
Results
Jacksonville, NC 28541

Windgate Park Apartments Street Resurfacing
Results
Less than $173,200 est. value
Jacksonville, NC 28541

Last Updated 07/19/2021 10:37 AM
Project Title

Sharon Way Pavement Project (2021)

Physical Address View project details and contacts
City, State (County) Jacksonville, NC   (Onslow County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed under this Contract includes materials, equipment, labor and traffic control to pull and replace 170 Lft of concrete curb and gutter (7.87 CY) and mill 2” of existing asphalt pavement (1558 SY), apply tack coat and pave back 2” of 9.5C surface mix from curb to curb. Traffic control devices will be set-up and maintained in accordance to the Manual of Uniform Traffic Control Devices for street and highway construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents