Similar Projects
HVAC Maintenance Services
Term Contract
Design
Downingtown, Hatboro, Philadelphia, PA

HVAC Maintenance Services
Term Contract
Design
Downingtown, Hatboro, Philadelphia, PA

George Wolf Elementary School HVAC Replacement
Alteration
Bidding
Bath, PA 18014

Air Quality Improvements at Marion Center Area School District Buildings
Alteration
Bidding
Marion Center, PA 15759

Design-Bid-Build (DBB), Building 633 River Water Cooling System, Philadelphia Naval Business Center (PNBC), Philadelphia, PA
Post-Bid
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19092

Replacement of Boilers and Domestic Hot Water Heaters
Post-Bid
Scranton, PA 18509

Danville State Hospital - HVAC Replacement
Results
$3,000,000 to $5,000,000 est. value
Danville, Mausdale, PA 17821

Construction of a New Warehouse - Heating and Ventilation Construction
Results
North East, PA 16428

Air Conditioning Repair Over 50 Tons
Alteration
Bidding
Philadelphia, PA

Heat Pump Condenser
Post-Bid
Philadelphia, PA

High School North Administration HVAC Replacement
Results
Newtown, PA 18940

Automatic Temperature Control Repair
Alteration
Bidding
Philadelphia, PA

Silverliner V HVAC Units
Post-Bid
Philadelphia, PA

Residence Hall B - Geothermal Pit - HVAC Construction
Results
$50,000 to $250,000 est. value
California, PA 15419

Z2da--Site Preparation For Electrospinner
Post-Bid
$25,000 est. value
Philadelphia, PA

Last Updated 04/12/2022 10:55 AM
Project Title

Bulk Cooling System Service

Physical Address View project details and contacts
City, State (County) Tobyhanna, PA 18466   (Monroe County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personnel services necessary to perform the Servicing of the Bulk Cooling System located in Building 1C Bay 2 in Tobyhanna Army Depot’s Machine Shop. Due to the production capacity of the Machine Shop this Bulk Cooling System Service must be completed over a 4 Day Holiday weekend so production will not be impacted.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents