Similar Projects
Ready Mix Concrete
Term Contract
Post-Bid
Salt Lake City, UT 84190

Qta Traffic Coating Replacement
Post-Bid
Salt Lake City, UT

Well Cementing and Pumping Services for Forge
Results
Salt Lake City, UT

Remove and Install Concrete at Various Areas of Lee Kay Public Shooting Range Phase II
Results
Salt Lake City, UT 84128

Patio Paver Replacement
Results
Salt Lake City, UT

Concrete Demolition - Installation - Repair
Results
UT

Annual Contract for Cement Work
Results
Salt Lake City, UT

Removal and Replacement of Concrete
Term Contract
Results
Salt Lake City, UT

Jordan Valley School Concrete Upgrades
Alteration
Post-Bid
Midvale, UT

HCH Vault 4 Linac Replacement - Concrete
Alteration
Results
$425,000 est. value
Salt Lake City, UT 84103

Concrete Ready Mix - 2021
Infrastructure
Results
Sandy, UT

PCC Improvements Concrete, Fence, Lights, Electrical
Alteration
Post-Bid
South Jordan, UT

SLCC Jordan Quad Concrete Replacement
Alteration
Post-Bid
$55,000 est. value
West Jordan, UT 84088

Concrete Repair and Re-Caulk
Alteration
Results
Salt Lake City, UT 84113

Granite Park Jr.: Cement Pad and Landscaping
Term Contract
Results
South Salt Lake, UT 84115

Last Updated 12/14/2021 04:43 PM
Project Title

Oquirrh Park

Physical Address View project details and contacts
City, State (County) Riverton, UT 84065   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $45,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace existing pavilion and concrete pad at Oquirrh Park, 12760 South 2700 West. The existing concrete pad is 25' x 28' and the existing pavilion is approximately 20' x 25' from eve to eve. New concrete pad and pavilion is to be the same size. New pavilion is to be all steel construction, 6" steel posts, Steelworx HP2025-SW style or acceptable substitute. Color to be determined. Demo and haul off existing concrete & pavilion. New concrete pad is to be 4000psi, AA-AE, six bag mix, 5" thick placed on 4" of road base, compacted to 95% compaction. Concrete pad is to have tied - #3 bar - 18" on center each way or wire mesh mat overlapped at a minimum of one square and tied.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents