Similar Projects
Miller Road Sewage Pumping Station Expansion
Renovation
Bidding
Elizabethtown, PA 17022

Sanitary Pump Station Modernization
Renovation
Bidding
Reading, PA 19605

Flowers Road Pump Station Construction General/Mechanical
Post-Bid
Derry, PA 15627

Jeannette Sewage Treatment Plant Pump Station Upgrade General / Mechanical Construction
Post-Bid
New Stanton, PA 15672

Long Term Control Plan Project 2018 Lift Station Improvements - General Construction
Results
Rochester, PA 15074

Pump Station No.1 Interceptor Sewer Lining and Manhole Repair Project
Results
$151,901 est. value
Carlisle, PA 17013

Sixth and Canal Pump Station Phase II Upgrade Project - Contract 1 - General Construction
Construction
$6,000,000 to $8,500,000 est. value
Reading, PA 19601

Maple Grove Sewage Pumping Station and Interceptor Expansion - General Construction
Construction
$1,400,000 est. value
Lancaster, PA 17603

Tanker Filling Station
Post-Bid
Renovo, PA

Shoreline Pump Station
Results
Erie, PA 16500

East Halls Pump Station Upgrades
New Construction, Demolition
Construction
$1,980,000 est. value
University Park, PA

Patch Pump Station Upgrades Project
Post-Bid
$120,000 est. value
Black Lick, PA

Contract 2 General Construction - 6 Mile Creek Pump Station Replacement and Equalization Tank Projects
Results
Harborcreek, PA

Sanders Road Pumping Station Replacement Project
Post-Bid
Fairfield, PA 17320

Southeast Pump Station - General Construction
Results
$350,000 to $500,000 est. value
Allenwood, Elimsport, PA 17810

Last Updated 03/31/2022 08:52 AM
Project Title

Nicklin Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Franklin, PA   (Cambria County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The replacement of the existing 2-Stage pump system with two new submersible pumps and a new control package. The new pumps will be operated on a variable frequency drive (VFD). The project also includes pipe and valve modifications inside the existing FRP pump station enclosure and wet well.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents