Similar Projects
Claremont Pump Station Stair Replacement - NS OPs
Bidding
Hampton, VA 23661

Walkway Replacement -Landing Replacement -Deck Replacement
New Construction
Bidding
Roseland, VA 22967

Rhoads Hall - Limited Facade Repairs - South and East Elevations
Post-Bid
Richmond, VA

Furnish and Install Retractable Awning at Maze Hall
Post-Bid
Petersburg, VA 23805

Z--652-17-930 Loading Dock Ramp & Canopy (Construction)
Results
$100,000 to $250,000 est. value
Hampton, VA 23667

Eagle, Globe and Anchor Installation
Results
Yorktown, VA 23691

VSDB Main Hall Exterior Renovation
Renovation - 49,283 SF
Bidding
Staunton, VA

Repair Exterior and Repaint Building
Post-Bid
Richmond, VA 23220

Construct Fountain in Trible Plaza
Results
$550,000 est. value
Newport News, VA 23606

Brick Facade Repair - Walker Building at Tidewater Community College
Bidding
Norfolk, VA

Jessup House Exterior Improvements
Post-Bid
Charlottesville, VA 22903

7th and Marshall Parking Deck Stairs Repairs
Results
Richmond, VA

Interior and Exterior Maintenance Facilities Support Services
Post-Bid
Fort Belvoir, VA 22060

Rosenwald Gym Weatherproof Wall Coating
Results
$78,980 est. value
Waynesboro, VA 22980

Circuit Court Roof and Cupola Repairs
Post-Bid
Charlottesville, VA

Last Updated 11/06/2019 03:06 PM
Project Title

York Hall Cupola Repairs

Physical Address View project details and contacts
City, State (County) Yorktown, VA 23690   (York County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,444 to $89,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace exterior wood on cupola to include removing and replacing all siding, crown molding and trim around windows, up to, but not including dental molding. Area near base of cupola is wrapped in aluminum. All wood to be replaced with PVC materials.Caulk and paint entire project area of cupola to include dental molding and crown molding just below copper roof system. Around base of weather vane, remove existing, deteriorating caulk and re-caulk all joints.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents