Similar Projects
Thousand Oaks Erosion Protection Project
Infrastructure
Bidding
$898,000 est. value
San Antonio, TX

Construction of Johnson Ranch North Unit 9 Public Water, Wastewater, Paving and Drainage Improvements and Johnson Ranch North Unit 9 Private Paving and Grading Improvements
Post-Bid
San Antonio, TX

Construction of Streets, Drainage, Water, and Wastewater for Somerset Grove Unit 1
Post-Bid
San Antonio, TX 78200

OP Schnabel Park Entrance and Bridge
Results
$783,000 est. value
San Antonio, TX

Underground Storm Drain Video Inspection Program
Results
Less than $4,250,000 est. value
San Antonio, TX 78205

Olmos Park FY 2020-2021 Street and Drainage Maintenance
Post-Bid
Olmos Park, TX

Construct 3 Low Water Crossing Improvements On Bent Oak Dr., Chimney Rock Ln. And Windmill Rd
Results
Shavano Park, TX 78231

Redbird Ranch Phase 2 Unit 1M-3 and Unit 3M-3A
Post-Bid
TX 78253

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Repair Storm Drainage at The Medical Education Training Campus (METC).
Post-Bid
$500,000 to $1,000,000 est. value
San Antonio, TX 78275

SECO Creek Headgate Project
Results
San Antonio, TX 78215

2020 Streets and Drainage Improvement Project
Infrastructure
Post-Bid
$7,527,271 est. value
San Antonio, TX

District 5 Drainage Improvements (West Gerald) Project
Results
Less than $900,000 est. value
San Antonio, TX 78211

Panther Springs Creek Restoration
Infrastructure
Post-Bid
San Antonio, TX

Olympia Hills Golf Course Hole #7 Drainage Improvements
Results
Universal City, TX 78148

Last Updated 10/04/2021 07:49 AM
Project Title

Jo Marie Area Drainage Improvement

Physical Address View project details and contacts
City, State (County) TX   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,627,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Jo Marie Street Phase 1 Drainage Improvements Project intends to provide drainage improvements to the street ditches and to alleviate street flooding, by installing an underground drainage system. It is important to note that this project, Phase 1, aims to resolve drainage issues along Jo Marie; the project focuses on addresses ditch capacity and maintenance concerns.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents