Similar Projects
Carbon School District Carpet
Renovation
Design
$90,000 CJ est. value
Price, UT 84501

Sound Sponge Divider
Term Contract
Results
Sandy, UT

Midvale City Art House on Main Street Sink and Counter Installation
Alteration
Post-Bid
Midvale, UT 84047

Wall Construction
Alteration
Results
Riverton, UT

Taylorsville Elementary School, Replace Ceiling Tiles
Alteration
Results
$100,000 est. value
Taylorsville, UT 84129

Salt Lake Community College South City Campus Earthquake Plaster Repair
Alteration
Results
$50,000 est. value
Salt Lake City, UT 84115

Welby Elementary Partition Replacement
Alteration
Results
$350,000 est. value
South Jordan, UT 84095

Hayden Peak Partition Replacement
Alteration
Results
$300,000 est. value
West Jordan, UT 84081

University Hospital NCC Ceiling Tile Replacement, Level 3
Renovation, Infrastructure - 14,000 SF
Results
$182,000 est. value
Salt Lake City, UT 84113

Remove and Replace Lockers at Kearns Junior High School
Alteration
Post-Bid
Kearns, UT 84118

Phase 2-Resurface Stairs, Dumpster and Asphalt Paving Improvements
Infrastructure, Alteration
Post-Bid
$550,000 est. value
Cottonwood Heights, UT 84121

DFCM Construction-Pre-Qualified General-UVU Multi-Building Lighting and Ceiling Grid Replacement
Alteration
Results
$375,000 est. value
Orem, UT 84058

Lone Peak High Classroom Ceiling Remodel
Alteration
Results
$150,000 est. value
Highland, UT 84003

Department of Workforce Services (DWS) Front Back Stair Replacement
Renovation
Results
$235,372 CJ est. value
Provo, UT 84604

Northern Utah Community Corrections Center A/B Hall Ceiling Repairs
Renovation
Post-Bid
$73,000 CJ est. value
Ogden, UT 84401

Last Updated 07/11/2023 05:07 PM
Project Title

Tenant Improvement Project

Physical Address View project details and contacts
City, State (County) Tooele, UT 84074   (Tooele County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Construction start expected January 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $470,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Each Offeror must submit an Offer bond from an approved surety company on form provided herein; or in lieu thereof, cash, certified check, or cashier check for not less than 5% of the total amount of the Offer, made payable to Tooele County as evidence of good faith and a guarantee that if awarded the contract, the Offeror will execute the contract and furnish all required Documents contract bonds as required. The right to reject any or all Offerors is reserved. This Project consists of the construction of the interior improvements of the existing Tooele County Roads Shop Storage Building. This includes but not limited to restroom, office, conference room, breakroom and shop working space improvements as shown on the provided construction drawings attached. It is also desired that the contractors provide a proposed fee to purchase and install an overhead crane in the shop area.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents