Similar Projects
Wood Lake Lift Station Improvements
Results
$625,000 est. value
Richfield, MN

Williston Road Lift Station Rehabilitation
Results
$1,950,000 est. value
Minnetonka, MN

2021 Lift Station Improvements
Bidding
Vadnais Heights, MN

DNR4 Gilfillan Lake WMA Pump Control Replacement
Renovation
Results
$35,000 est. value
MN

2021 Sanitary Lift Station No. 33 and No. 34 Improvements
Renovation
Post-Bid
$532,065 est. value
Moorhead, MN

Waverly Lake Phase 4 Improvements
Results
$3,500,000 est. value
Waverly, MN

Sanitary Lift Station No. 2 Improvements
Bidding
$230,000 est. value
Maple Lake, MN

Lift Station Maintenance and Repair Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

Construction of a Booster Station
Results
Less than $350,000 est. value
Saint Louis Park, MN 55426

Rehabilitation of Lift Station 6
Renovation
Results
Brooklyn Park, MN

Booster Station Replacement
Post-Bid
Proctor, MN

Meter And Booster Stations
New Construction
Results
Cloquet, MN

DNR2 RFB Brainerd Office Replacement Lift Pumps
Renovation
Post-Bid
Brainerd, MN 56401

Ridgedale Booster Station Improvements
Results
$450,000 est. value
Minnetonka, MN 55345

Lincoln Pump Station Improvements
Renovation
Results
$160,000 est. value
Lake Benton, MN

Last Updated 02/02/2021 01:27 AM
Project Title

Storm Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Eagan, MN   (Dakota County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $735,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Removal of existing lift station equipment and piping at the Yankee Doodle Storm Lift Station. The project includes the removal of the existing precast wet well lid and the top portion of the existing overflow structure. 2. Replace the buried gate valve between the existing wet well and overflow structures. 3. Reuse the existing wet well and furnish a new valve vault structure. Install pumps, piping, fittings, valves, and all appurtenances for the new station. 4. Furnish and install new controls for the Yankee Doodle Storm Lift Station, as noted in the Contract Documents. 5. Relocate the existing electrical transformer and install new power wiring between new transformer location and new control panel. 6. Furnish and install a new intake pipe in the adjacent pond and new intake structure between the pond and the existing overflow structure.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.