Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Jim Thorpe Retaining Wall
Infrastructure
Design
$3,144,640 est. value
Lehighton, PA 18235

I-80 White Haven Bridges
Infrastructure
Design
$60,066,260 CJ est. value
Jim Thorpe, PA 18229

Structure Replacement, Rockport Road Over Buck Mountain Creek
Infrastructure
Bidding
Packer Township, PA 18255

Structure Replacement, Rockport Road Over Buck Mountain Creek
Infrastructure
Bidding
Packer Township, PA 18255

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

SR 903 Jim Thorpe
Infrastructure
Post-Bid
$500,000 to $999,999 est. value
Jim Thorpe, PA 18229

Milling and Paving Project
Results
$451,716 est. value
Weatherly, PA 18255

Rehabilitation of Lehigh Gorge Trail Bridge - Bridge No. 6435-1408
Renovation
Results
$100,000 to $500,000 est. value
PA

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Single Asphalt Seal Coat, In-Place and Double Asphalt Seal Coat, In-Place
Infrastructure
Design
$200,000 CJ est. value
Albrightsvlle, PA 18210

2022 Multi Location Paving Project
Infrastructure
Post-Bid
Jim Thorpe, PA

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

Jim Thorpe Retaining Wall Rehab
Infrastructure
Conception
$3,592,140 CJ est. value
Lehighton, PA 18235

Last Updated 03/06/2023 03:31 AM
Project Title

Hunter Creek Bridge

Physical Address View project details and contacts
City, State (County) Jim Thorpe, PA 18229   (Carbon County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2025
Bids Due View project details and contacts
Estimated Value $1,884,010 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

State Route 2002 over Hunters Creek. Primary Improvement Type: Replace/Rehab As of March 06, 2023, the project is Future development stage. Anticipated letting date is April 01, 2025. PennDOT - Hunter Creek Bridge *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents