Similar Projects
Cascade Middle School HVAC Replacement Phase 2
Alteration
Bidding
$420,000 est. value
Wartrace, TN 37183

HVAC Systems for the Park Theatre
Alteration
Bidding
$217,000 est. value
McKenzie, TN 38201

HVAC Replacement, Lighting, and Associated Renovations
Post-Bid
Chattanooga, TN 37406

Testing and Balancing for HVAC Systems
Term Contract
Post-Bid
Chattanooga, TN

HVAC Replacement for Dogwood Manor
Results
Chattanooga, TN 37402

Mary Walker Towers Renovations of Stairwells & HVAC Systems
Results
Chattanooga, TN

Liberty Elementary Boiler Replacement
Alteration
Bidding
Shelbyville, TN 37160

COVID-19 Install Air Handling Unit Ultraviolet Lights 626-20-504 and 626A4-20-507 - MATOC
Post-Bid
Murfreesboro, Nashville, TN 37212

HVAC Replacement at Center for Creative Arts - Phase 2
Results
Chattanooga, TN 37405

Heating, Ventilation, and Air Conditioning (HVAC) Maintenance, Installation
Term Contract
Post-Bid
Nashville, TN

Gateway Tower Renovation HVAC Systems Replacement
Results
Chattanooga, TN 37402

Metro Wide Chiller Maintenance, Inspection and Repair Services
Term Contract
Post-Bid
TN

Headworks Slide Gates and Installment
Results
Crossville, TN

2021 Indoor Air Quality Improvements - Furnishing of Air Purification Equipment
Post-Bid
Greeneville, TN

HVAC Replacement at Pleasant Ridge
Results
LaFollette, TN 37766

Last Updated 05/06/2022 08:06 AM
Project Title

Sundquist Science Complex Exhaust System Controls

Physical Address View project details and contacts
City, State (County) Clarksville, TN 37044   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removing and replacing the existing supply and exhaust venturi air valves serving the labs and fume hoods in the Sundquist Science Complex. The new venturi air valves will have the latest control technology and will be integrated into a new lab control system. The existing fume hoods will remain in place, but the existing fume hood monitors and zone presence sensors (where applicable) will be removed and replaced.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents