Similar Projects
Lime, Sodium Chlorite, Water Meters, Waterline Repairs/Supplies
Post-Bid
Mount Vernon, OH 43050

Utilities Department Materials and Supplies for 2019
Post-Bid
Lima, OH

Sanitary Sewer Meter Manhole
Results
$75,000 est. value
Lordstown, OH

LMI Water Service Line Replacement
Results
$100,000 est. value
Crooksville, OH

Liberty Township Water Main Extension
Results
Less than $555,375 est. value
Norwalk, OH

2018 Advanced Metering Infrastructure System (Ami) Project
Results
$800,000 to $900,000 est. value
Carey, OH

Locust Lake Lift Station and Conveyance Improvements Project
Results
$1,600,000 est. value
Batavia, OH

Waterline Replacement at Alum Creek Lake, Lewis Center, OH
Results
$25,000 to $100,000 est. value
Lewis Center, OH 43035

Diller Road Waterline Improvement Area
Results
Less than $183,640 est. value
Lima, OH 45801

Michigan Avenue Waterline Replacement - Phase Two
Results
Waterville, OH 43566

Chicago Avenue Waterline Replacement - OPWC
Results
Less than $125,290 est. value
Hicksville, OH

Brandt Waterline Loop Project
Results
Less than $90,000 est. value
Troy, OH 45373

Beatrice Drive Lift Station (N-30) and Force Main Replacement
Results
Less than $785,000 est. value
OH

2018 Water Main Repairs 690521-100006
Results
Less than $376,488 est. value
Columbus, OH

650872, 650871 Lateral Lining and Downspout Redirect Clintonville 1
Results
Columbus, OH

Reported 01/12/2019 12:00 AM
Project Title

Water Meter System Replacement Project

Physical Address View project details and contacts
City, State (County) Mansfield, OH   (Richland County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Improve the process of collecting monthly water utility meter data to enhance the level of service offered to customers. The AMI Full Service Program will be implemented system wide in a short time frame, in order to maximize the benefits of the system. Turnkey deployment of approximately 19,000 metered accounts, followed by an ongoing maintenance program that includes network, AMI endpoints, and software maintenance as well as full service data hosting and delivery to the City.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents