Similar Projects
Masonry Remediation at Henry Puffer,Fairmount and Various - Downers Grove Grade School District 58
Renovation
Conception
$1,441,334 CJ est. value
Downers Grove, IL 60515

Floor Tile Asbestos Abatement , Alternates Abatement, Floor Tile and Alternates Flooring - Henry Puffer Building - Downers Grove Grade School District 58
Renovation
Conception
$377,331 CJ est. value
Downers Grove, IL 60515

Blanchard Circle Mixed Use Buildings
New Construction, Infrastructure - 16,400 SF
Design
$4,000,000 CJ est. value
Wheaton, IL 60189

Roofing Work at Willowbrook High School
Renovation
Design
$150,000 CJ est. value
Villa Park, IL 60181

Sandburg Middle School Renovations
Renovation
Bidding
$12,000,000 CJ est. value
Elmhurst, IL 60126

Phase 4 Renovations at Hinsdale Central High School / Bid Period 5
Renovation
Bidding
$2,000,000 CJ est. value
Hinsdale, IL 60521

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Early Childhood Center
Renovation, Addition
Post-Bid
Villa Park, IL 60181

Cloverdale ES New Innovative Center
Renovation
Results
Carol Stream, IL 60188

Burr Ridge Ccsd 180 2021 Site Improvements
Renovation
Results
Burr Ridge, IL 60527

Montessori School
Build-Out - 18,000 SF
Construction
Naperville, IL 60540

Timothy Christian Schools
Renovation
Pending Verification
Elmhurst, IL 60126

Roofing Work
Renovation
Design
$600,000 CJ est. value
Addison, IL 60101

2023 Capital Improvements Project
Renovation
Bidding
$2,429,000 CJ est. value
Wheaton, IL 60187

Student Transition Center
Renovation
Post-Bid
Elmhurst, IL 60126

Last Updated 10/13/2022 11:32 AM
Project Title

2023 Capital Improvements at Addison School District 4

Physical Address View project details and contacts
City, State (County) Addison, IL 60101   (DuPage County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $320,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Please Note: All Contractors that plan on attend-ing must present a valid Drivers License or State ID to gain access to the School at this time. Masks will be optional for all person-nel. D. Bid security in the form of a bid bond only in an amount equal to 10 percent of the base bid amount shall be submitted with the bid. Bid security shall be made payable to the Board of Education Addison School District 4. The Bid Package # must be clearly marked on the envelope. F. The Board of Education reserves the right to reject any or all bids or parts thereof, or waive any irregularities or informalities, and to make the award in the best interest of the District. G. All bidders must comply with applicable Illinois Law requiring the payment of prevailing wages by all Contractors working on public works. Bidder must comply with the Illinois Statutory requirements regarding labor, including Equal Employment Opportunity Laws.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents