Similar Projects
Center East
New Construction - 596,000 SF
Conception
$10,000,000 CJ est. value
New York, NY 10065

Fordham Landing - Master Plan
New Construction - 1,530,000 SF
Conception
$3,500,000,000 est. value
University Heights, NY

Reconstruct Elevators - Hedrick Hall & Food Science Research Lab
Renovation - 1,000 SF
Bidding
$1,000,000 to $1,250,000 est. value
Geneva, NY 14456

IDIQ MATOC for Healthcare and Medical Research Laboratory Facility Design Build Construction, In Support of The Defense Health Agency (DHA) Sustainment, Restoration and Modernization Program
New Construction
Post-Bid

IDIQ MATOC for Healthcare and Medical Research Laboratory Facility Design Build Construction, In Support of The Defense Health Agency (DHA) Sustainment, Restoration and Modernization Program
New Construction
Post-Bid

TMP16 IR Lab and TMP 30 Biplain IR Lab Replacement
Results
Valhalla, NY 10595

Wyoming County Community Hospital Laboratory Renovations
Renovation - 5,400 SF
Results
Less than $2,032,000 est. value
Warsaw, NY 14569

Lock 7 Affordable Housing
New Construction - 82,000 SF
Construction
$27,000,000 est. value
Oswego, NY 13126

St Olin Chemistry Research Wing - Chem Lab 573-580 Renovation
Renovation - 1,483 SF
Construction
$780,000 est. value
Ithaca, NY 14850

BioBAT Lab Expansion
Renovation - 85,000 SF
Pending Verification
$50,000,000 est. value
Brooklyn, NY 11220

New York Blood Center
New Construction - 596,200 SF
Conception
New York, NY

Syracuse University - Heroy 1st Floor Modification
Renovation
Post-Bid
Syracuse, NY 13210

Health Lab CC Building Renovations - Phase 2
Renovation
Results
Buffalo, NY 14214

CCC 5th Fl, BSB 3rd Fl And IT Office Renovations
Renovation - 7,000 SF
Construction
$1,200,000 est. value
Buffalo, NY 14263

Syracuse University - Physics Building 021 Modifications
Renovation
Post-Bid
Syracuse, NY 13210

Reported 05/17/2022 12:00 AM
Project Title

NSLS-II Experimental Tools-II (NEXT-II) CDI SEB Building and ARI and SXN Cabin

Physical Address View project details and contacts
City, State (County) Upton, NY 11973   (Suffolk County)
Category(s) Laboratory
Sub-Category(s) Laboratory
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Construction of the CDI-Satellite Endstation Building for the research facility NSLS-II, at Brookhaven National Laboratory (BNL). The Work consists of, but is not limited to, the construction of a one story steel and concrete structured addition to existing NSLS II. Inclusive of renovation to a portion of the existing building and complete fix-out of all interior finished and MEP and Telcom systems and site improvements as required as part of the Work.

Details

Laboratory, 8,200 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents