Similar Projects
Annual Contract - Asphalt, Paving and Pathway Construction
Term Contract
Bidding
FL

Northwest (NW) County Intersection Improvements Group 3
Bidding
$3,807,115 est. value
Tampa, FL 33608

Miami Circle
Post-Bid
Miami, FL 33131

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Thompson Valley Road Resurfacing Project
Results
Less than $1,100,000 est. value
Monticello, FL

River Road Resurfacing
Results
Less than $101,347 est. value
FL

26th Street West at 30th Avenue West Intersection Improvements
Infrastructure
Bidding
Bradenton, FL 34206

Two Mini Circles on 79th Street South at 2nd Avenue and 4th Avenue
Post-Bid
Saint Petersburg, FL 33707

Street Resurfacing 2019
Results
Less than $2,500,000 est. value
Palm Coast, FL 32137

Cape Coral Parkway Eastbound Turn Lane Extension at Del Prado
Infrastructure
Bidding
Cape Coral, FL 33909

Restore Maintenance Road GATR Site
Post-Bid
Panama City, FL

I-10 Rest Area Reconstruction
Results

CR 40 Scop Improvements
Infrastructure
Bidding
Less than $2,250,000 est. value
Bronson, FL

Construction Services For Epperson North District Improvements Pasco County
Post-Bid
Wesley Chapel, FL

Spine Road Phase Two Roadway Project
Results
Fort Lauderdale, FL 33301

Last Updated 06/07/2021 07:56 AM
Project Title

Whitehead and Front Street Improvements

Physical Address View project details and contacts
City, State (County) Key West, FL 33040   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,107,477
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Providing all site work, materials, equipment and labor necessary to accomplish, Water utility replacement (including but not limited to the replacement of existing water main and service laterals), minor storm drainage (curb inlets and pipes), sidewalks, ADA curb ramp upgrades, utility trench repair, milling and resurfacing of the existing asphalt roadway surface, utility cover adjustments, signing and pavement markings

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 22 - Plumbing, Facility Storm Drainage, Facility Storm Drainage Piping.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents