Similar Projects
Full Depth Reclamation, Resurfacing, and Traffic Stripe on Various Public Roads
Bidding
$1,632,218 to $1,994,933 est. value
AL

Constructing the Full Depth Reclamation, Resurfacing, and Traffic Stripe on Various Public Roads
Post-Bid
$1,356,566 to $1,658,025 est. value
Opelika, AL 36801

Southern Region Disaster Recovery Support BPA
Results

Opelika High School Bus Loop Improvements
Results
Less than $65,950 est. value
Opelika, AL

Northeast Campus - Utility Expansion
Results
Auburn, AL 36849

Geneva Street Improvements
Results
Less than $2,276,319 est. value
Opelika, AL 36803

Campus Wide - Contract for Asphalt Grading and Paving Services
Results
Auburn, AL 36849

Campus Wide - Contract for Concrete Paving Services
Results
Auburn, AL 36849

Planing, Resurfacing, and Traffic Stripe on SR-14
Results
$2,325,445 to $2,842,211 est. value

Constructing the Resurfacing (Full Depth Reclamation), Guardrail Installation, and Traffic Stripe
Results
$925,827 to $1,131,567 est. value
AL

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Cox Road Widening Project
Results
Less than $2,000,000 est. value
Auburn, AL 36830

City-Wide Asphalt Paving Project
Results
Opelika, AL

Renew Opelika Road Phase 4 Project
Results
Auburn, AL 36830

Constructing the Roundabout (Grading, Drainage, Pavement, Lighting, and Striping)
Results
$1,995,646 to $2,439,122 est. value
AL

Last Updated 09/03/2020 09:54 AM
Project Title

TAPAA-TA19 (916) 1st Avenue Tap Project

Physical Address View project details and contacts
City, State (County) Opelika, AL   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Streetscape improvements on 1st Avenue, from N 7th Street to North 8th Street, on North 8th Street, from N Railroad Avenue to the 1st Avenue, sidewalks, curb, concrete roadway and landscaping. The principles items of work are approximately as follows: clearing; paving and concrete demolition; earthwork; storm structures; erosion control measures; traffic control measures; sidewalk; concrete roadways; driveways and landscaping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete.
Division 31 - Earthwork, Site Clearing, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents